{
    "id": "sam:ac6cf6b5c4b941ed9e116ed68b99649a",
    "url": "https://outfortender.com/tender/sam-ac6cf6b5c4b941ed9e116ed68b99649a",
    "official_notice": "https://sam.gov/opp/ac6cf6b5c4b941ed9e116ed68b99649a/view",
    "title": "Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project",
    "titles": {
        "en": "Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project"
    },
    "description": "As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.",
    "description_language": "en",
    "buyer": "W2SD ENDIST NEW YORK, Dept of Defense",
    "country": "US",
    "country_name": "United States",
    "category": "Construction work",
    "procedure": "Solicitation",
    "published": "2026-09-18",
    "deadline": "2026-10-19T14:00:00-04:00",
    "status": "open",
    "source": "sam"
}