Out For Tender

Out For Tender › Estados Unidos › Trabajos de construcción

Rosebud Lift Station Construction

Órgano de contratación
DIV OF ENGINEERING SVCS - SEATTLE, Health and Human Services, Department of
País
Estados Unidos
Categoría
Trabajos de construcción
Fecha límite
Cierra el 1 Dec 2026 (1 Dec 2026 17:00 UTC-5)
Publicada
27 Oct 2026
Procedimiento
Solicitation

Leer el anuncio oficial y licitar → La presentación de ofertas se realiza siempre en el portal del órgano de contratación, nunca aquí.

Qué solicita el órgano de contratación

The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration. This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system.

Idioma de este anuncio: English. El título y la descripción se muestran tal como los publicó el órgano de contratación.

How this compares

  • This is one of 929 open tenders in Estados Unidos for Trabajos de construcción.
  • Bidders were given 35 days from publication to the deadline; the median for open tenders in Estados Unidos is 21 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference 75H70127R00007 · JSON