Out For Tender › Estados Unidos › Máquinas, aparatos, equipo y productos consumibles eléctricos; iluminación
DRAWER ASSEMBLY,SIG
- Órgano de contratación
- NAVSUP WEAPON SYSTEMS SUPPORT MECH, Dept of Defense
- País
- Estados Unidos
- Categoría
- Máquinas, aparatos, equipo y productos consumibles eléctricos; iluminación
- Fecha límite
- Cierra en 15 días (9 Oct 2026 16:30 UTC-4)
- Publicada
- 22 Sep 2026
- Procedimiento
- Solicitation
Leer el anuncio oficial y licitar → La presentación de ofertas se realiza siempre en el portal del órgano de contratación, nunca aquí.
Qué solicita el órgano de contratación
CONTACT INFORMATION|4|N744.11|BL5/BL6|771-229-0480|rachel.e.kern4.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|NA|TBD|N00104|TBD|TBD|See Schedule|TBD|NA|NA|TBD|||||| MONETARY LIMITATION REPAIR PURCHASE ORDERS|1|Varies per NIIN| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|POC on Page 1| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|259 Days ARO| OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)|1|259 Days ARO| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This solicitation is for the repair of 3 each of NSN 6110 LLH0C8141 IAW Reference number N148189-1. 3 each of NSN 5915 016010534 IAW Reference number N132187. 2 each of NSN 5998 016455735 IAW Reference number N140666-3. 6 each of NSN 7025 016607023 IAW Reference number N131372-4. Replacement or new procurement will not be considered. The Government does not own the drawings or data rights to this NSN. 2. Government-Source Inspection and Acceptance (G-S I&A) is required. If the G-S I&A will occur at a different CAGE from the Admin Award CAGE, please provide therepair facility CAGE and/or packaging CAGE with the quote. 3. Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual dateof physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. a. Requested RTAT: 140 Days b. Proposals shall reference the proposed RTAT and any capacity constraints. 4. Please provide the following information in the repair quote: a. Your CAGE (used as the awardee CAGE):___________________ b. the unit repair price: $____________________________________ and whether this price is firm-fixed price (FFP)_____; or estimated______ c. Beyond Repair (BR) Price $____________. d. Repair turn-around (number of days from receipt of asset(s) to shipment of repaired asset(s):_______days e. Throughput Constraint: _____/month. Refers to the total assets to be repaired monthly after initial delivery commences. A throughput of 0000/month reflects no throughput constraint. f. The new procurement cost of this NSN (if known): $________________________ g. Is this item (NSN) OBSOLETE: YES____ or NO _____ h. The repair CAGE _____________ and packaging CAGE___________. 5. Teardown and evaluation only quotes will NOT be accepted. 6. If this order is issued under and pursuant to the provision of the…
Idioma de este anuncio: English. El título y la descripción se muestran tal como los publicó el órgano de contratación.
Source: SAM · reference N0010426QNE60 · JSON