Out For Tender › Estados Unidos › Equipos de transporte y productos auxiliares
DRAFT RFP - Landing Gear Collaborative Supply Chain Integration II
- Órgano de contratación
- DLA AVIATION AT OGDEN, UT, Dept of Defense
- País
- Estados Unidos
- Categoría
- Equipos de transporte y productos auxiliares
- Fecha límite
- Cierra el 1 Mar 2027 (1 Mar 2027 17:00 UTC-7)
- Publicada
- 19 Aug 2026
- Procedimiento
- Solicitation - Small Business Set Aside - Total
Leer el anuncio oficial y licitar → La presentación de ofertas se realiza siempre en el portal del órgano de contratación, nunca aquí.
Qué solicita el órgano de contratación
RFP Description: Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) Overview Defense Logistics Agency (DLA) Aviation at Ogden is issuing this formal solicitation for the Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) program. This requirement is being competed as a 100% Small Business Set-Aside under full trade-off source selection procedures. Solicitation Number: SPRHA1-26-R-1003 Set-Aside Status: 100% Small Business Set-Aside NAICS Code: 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing PSC Code: 1620 - Aircraft Landing Gear Components Contract Type: Single-Award ID/IQ (Firm-Fixed-Price with EPA) Period of Performance: 10 Years (5-Year Base + One 5-Year Option) Scope of Work The LG-CSCI2 program provides performance-based supply chain support for competitive landing gear components associated with USAF aircraft. The scope encompasses approximately 2,800 National Item Identification Numbers (NIINs), including USAF Depot Level Reparables (DLRs) and DLA consumables. These range from simple consumable items to complex DLRs requiring forgings and long lead times. The Prime Contractor will provide end-to-end supply chain management, engineering oversight, quality assurance, and procurement. Key program objectives include: Achieving a 95% On-Time Delivery (OTD) rate for DLA-managed parts and a 90% OTD rate for USAF-managed parts. Reducing Production Lead Times (PLTs) across the supply chain by a minimum of 25%. Executing strategic raw material purchasing, forging die management, and Obsolescence/DMSMS management. Solicitation Attachments & Instructions The official Request for Proposal (RFP), Technical Requirements Document (TRD), and other applicable attachments are provided in this posting. Note on Bid Sets: Bid sets for the individual NIINs are not hosted directly on SAM.gov. They will be mailed via removable drives to interested parties. Please provide your firm's mailing address to the DLA Contracting POCs listed below to request a removable drive be mailed to you. Points of Contact: Primary: Nathan Flinders, Contracting Officer (nathan.flinders@dla.mil) Secondary: Justin Rogers, Contracting Officer (justin.rogers.28@us.af.mil)
Idioma de este anuncio: English. El título y la descripción se muestran tal como los publicó el órgano de contratación.
Source: SAM · reference SPRHA1-26-R-1003 · JSON