Out For Tender › Estados Unidos › Trabajos de construcción
Davis Building Rehabilitation
- Órgano de contratación
- W072 ENDIST DETROIT, Dept of Defense
- País
- Estados Unidos
- Categoría
- Trabajos de construcción
- Fecha límite
- Cierra en 7 días (12 Nov 2026 14:00 UTC-5)
- Publicada
- 27 Oct 2026
- Procedimiento
- Sources Sought
Leer el anuncio oficial y licitar → La presentación de ofertas se realiza siempre en el portal del órgano de contratación, nunca aquí.
Qué solicita el órgano de contratación
THIS IS A SOURCES SOUGHT NOTICE. THIS IS FOR MARKET RESEARCH PURPOSES ONLY. This is NOT a solicitation. This is not a Request for Bid, Proposal, or Quote. It does not constitute a solicitation and shall not be construed as a commitment to the Government. NO SOLICITATION OR ATTACHMENTS are available for this notice. Responses in any form are not offers and the Government is under no obligation to award a contract as a result of this announcement. No funds are available to pay for preparation of responses to this announcement. No reimbursement will be made for any costs associated with providing information in response to this survey. Any information submitted by respondents to this Sources Sought notice is strictly voluntary. Responses will not be returned to the responder. Not responding to this notice does not preclude participation in any future Request for Quote (RFQ), Invitation for Bid (IFB) or Request for Proposal (RFP), if any are issued. This survey is for market research purposes only. Only contractors capable of performing this type of work should respond to this notice. INTRODUCTION The U.S. Army Corps of Engineers (USACE), Detroit District, is issuing this Sources Sought notice and conducting market research as a means to identify interest and capabilities of both small and large business entities to provide design and construction services for the Davis Building Rehabilitation project located at the Soo Locks Complex in Sault Sainte Marie, Michigan. The information collected will be used to help determine the appropriate strategy to solicit and award the project. BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE/MARKET RESEARCH, THIS REQUIREMENT MAY BE SET-ASIDE FOR SMALL BUSINESSES (IN FULL OR IN PART) OR PROCURED THROUGH FULL AND OPEN COMPETITION. All small business set-aside socioeconomic categories will be considered. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. REQUIREMENT* for the Davis Building Rehabilitation project Summary Scope: The contractor will provide all materials, labor, equipment, supervision, and administration as necessary for repairs, rehabilitation, and construction to the historic Davis Pump Well Building located at the Soo Locks in Sault Sainte Marie, MI. The historic building was built in the early 1900s and is located on the island between the Poe Lock and the Davis Lock (now the New Lock currently in construction). Referenced picture of the Davis Building attached to this notice. Primary purpose of the building was to facilitate the dewatering of the locks for regular operations, but pumps are now decommissioned and removed due to construction of the New Lock. The facility is intended to be repurposed to facilitate up to 50 maintenance personnel including, but not limited to, locker rooms, break rooms, kitchen/laundry and staff offices. The Davis Building currently provides approximately 4,200 square-feet of ground floor office space with approximately 4,200 square-foot of basement that houses mechanical and electrical systems. Due to project location, barge-based transportation and load handling equipment will be required. The schedule is estimated to take 36 months, which includes up to 12 months for design and 24 months for construction. Project will include but is not limited to the following: Repair or replace deteriorating clips holding the limestone fascia to the building. Design and implement a water mitigation plan to manage stormwater runoff from roof downspouts and prevent moisture intrusion in the basement. Replace all windows and doors. Design and construct a new subterranean locker room in place of the existing pump well access ramp that is no longer needed and complete all necessary earthwork, backfill, structural compaction, and surface grading to eliminate the ramp opening and restore surface elevations flush with surrounding grade. Construct a mezzanine level above…
Idioma de este anuncio: English. El título y la descripción se muestran tal como los publicó el órgano de contratación.
How this compares
- This is one of 944 open tenders in Estados Unidos for Trabajos de construcción.
- Bidders were given 16 days from publication to the deadline; the median for open tenders in Estados Unidos is 21 days.
More open tenders from this buyer
St. Marys Falls Canal Snow Removal
W072 ENDIST DETROIT, Dept of Defense
Duluth Vessel Yard Phase III Repairs
W072 ENDIST DETROIT, Dept of Defense
Similar open tenders
Jake Rocks Road Reconstruction
USDA-FS, CSA SOUTHWEST 7, Agriculture, Department of
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
W2SD ENDIST NEW ENGLAND, Dept of Defense
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
W2SD ENDIST NEW ENGLAND, Dept of Defense
N4008526R0228 DESIGN-BUILD (DB), REPAIR OTC DORM KING HALL BLDG 291, NAVAL STATION NEWPORT RI, NEWPORT RHODE ISLAND
NAVFACSYSCOM MID-ATLANTIC, Dept of Defense
GAOA Grizzly Bear Campground
Black Hills National Forest, Agriculture, Department of
Source: SAM · reference PANGLR-26-P-0000032643 · JSON