Out For Tender

Out For Tender › Estados Unidos › Servicios de arquitectura, construcción, ingeniería e inspección

C222--657A5-24-108, FCA Replace Medium Voltage Feeder 3 and Transformers l MC FY27 NRM VISN Base DE

Órgano de contratación
255-NETWORK CONTRACT OFFICE 15 (36C255), Veterans Affairs, Department of
País
Estados Unidos
Categoría
Servicios de arquitectura, construcción, ingeniería e inspección
Fecha límite
Cierra en 3 días (17 Nov 2026 12:00 UTC-6)
Publicada
10 Nov 2026
Procedimiento
Presolicitation - Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)

Leer el anuncio oficial y licitar → La presentación de ofertas se realiza siempre en el portal del órgano de contratación, nunca aquí.

Qué solicita el órgano de contratación

Modification 2 to Presolicitation Notice 36C25527R0013 This modification provides answers to RFIs received and revised the evaluation criteria to be used for this project. RFIs Received for Project # 657A5-24-108, Replace Medium Voltage Feeder 3 and Transformers 1. Factor 4 Past Performance / Section F Project Eligibility  The solicitation states that projects submitted for past performance consideration must have completed both design and construction, and that projects not constructed will not be considered. Would the VA consider accepting relevant electrical infrastructure studies or assessments in Section F, particularly those involving medium-voltage distribution systems and feeder evaluations, that demonstrate directly applicable technical expertise but did not result in construction? We prefer to keep it as projects that were designed AND constructed. Since this is a construction project and not a study, we want projects that have been finished to be used for past performance criteria.  2. Factor 2 Specialized Experience and Technical Competence / Laboratory Requirements  Factor 2 references the firm's technical capabilities in design quality management procedures, CADD/BIM, equipment resources, and laboratory requirements. Given that the project scope primarily involves medium-voltage electrical feeder and transformer replacements, could the VA clarify the applicability of laboratory requirements to this project? We respectfully request that this criterion be removed from the evaluation requirements, as it does not appear directly relevant to the stated scope of work. Laboratory requirements were deleted. Please see revised evaluation criteria below.  3. Request for Submission Deadline Extension Given the technical scope of the project and the level of detail required to address the evaluation criteria, we respectfully request a one-week extension of the SF330 submission deadline, from November 10, 2026, to November 17, 2026. This additional time would allow interested firms to prepare comprehensive qualifications packages that fully address the solicitation requirements. SF330 submission due date extended from 11/10/2026 to 11/172026. End of RFIs.

Idioma de este anuncio: English. El título y la descripción se muestran tal como los publicó el órgano de contratación.

How this compares

  • This is one of 113 open tenders in Estados Unidos for Servicios de arquitectura, construcción, ingeniería e inspección.
  • Bidders were given 7 days from publication to the deadline; the median for open tenders in Estados Unidos is 18 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference 36C25527R0013 · JSON