Out For TenderEtiopíaTrabajos de construcción

Procurement of Plant Design, Supply, Installation, test and Commissioning of atrasnmission line associated with substaiton of Shashemene-II, Bale Robe, Bensa Daye and Durame

Órgano de contratación
Ethiopian Electric Power
País
Etiopía
Categoría
Trabajos de construcción
Fecha límite
Cierra el 10 Nov 2026 (10 Nov 2026 14:00 UTC-8)
Publicada
17 Sep 2026
Procedimiento
Request for Bids

Leer el anuncio oficial y licitar → La presentación de ofertas se realiza siempre en el portal del órgano de contratación, nunca aquí.

Qué solicita el órgano de contratación

Specific Procurement Notice Request for Bids Plant Design, Supply and Installation (Two-envelope Bidding Process, Without Prequalification) Employer: Ethiopian Electric Power (EEP) Project: Power Sector Reform, Investment and Modernization in Ethiopia - (PRIME-1) Contract title: Plant Design, Supply, Installation, test and Commissioning of transmission line associated with substation of Shashemene-II 230/132/33/15kV, Bale Robe 132/33/15kV, Bensa Daye 132/33kV, and Durame 132/15kV substations Country: Ethiopia Loan No. Credit No. IDA-75200 RFB No: ET-EEP-532480-CW-RFB` The Government of the Federal Democratic Republic of Ethiopia has received financing from the World Bank toward the cost of the Power Sector Reform, Investment and Modernization in Ethiopia (PRIME-1), and intends to apply part of the proceeds towards payment under the contract for Plant Design, Supply, Installation, test and, Commissioning of Transmission line associated with New Shashemane II 230/132/33/15kV, Bale Robe 132/33/15kV, Bensa Daye 132/33kV, Durame 132/15kV Substations. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing, except for those payments, which the contract provides to be made through letter of credit. The Ethiopian Electric Power (EEP) now invites sealed Bids from eligible Bidders for Plant Design, Manufacture, Supply, Installation, test and Commissioning of Transmission line associated with New Shashemane II 230/132/33/15kV, Bale Robe 132/33/15kV, Bensa Daye 132/33kV, Durame 132/15kV, substations. The work involves Plant design, supply, installation, testing, and commissioning of approximately 90 km of double-circuit transmission lines at 230 kV and 132 kV levels. The lines utilize AAAC (ASH) and ACSR (TIGER, OSTRICH, YAW) conductors with single optical fiber cable shield wires. Self-supporting, tapered, galvanized steel lattice towers with pad-and-chimney concrete footings will be used. The transmission lines connect various existing lines to new substations at Shashemene II, Durame, Bensa Daye and Bale, Woliso, Haromaya through Line-In Line-Out (LiLo) arrangements; and Design, Manufacture and delivery of about 2 km of a double circuit 132 Kv and 230kV, 3-phase, AAAC “ASH” and “YAW” conductor , single optical fiber cable shield wire on self-supporting, tapered configuration, vertical formation galvanized steel lattice towers with each leg having a separate footings of pad and chimney concrete type, from existing Melkawakena Yogo-Yadot 132kV, Wolkite - Sebeta II/Woda LILO/ 230kV and Diredawa II-Harere III 132kV transmission line in line out(LiLo) arrangement. The expected duration of the Contract is 548 calendar days, plus 12 months of Defect Liability Period. No margin of domestic preference shall apply, and bidders are required to meet the following key qualification criteria, which include: Financial Capabilities Submission of audited balance sheets or if not required by the law of the Bidder’s Country, other financial statements acceptable to the Employer, for the last five [5] years to demonstrate the current soundness of the Bidder’s financial position and its prospective long-term profitability. Average Annual Turnover Minimum average annual turnover in power sector USD 15.5 million calculated as total certified payments received for contracts in progress or completed, within the last five (5) years. Financial Resources The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet: (i) the following cash-flow requirements: USD 2.5 million, and (ii) the overall cash flow requirements for this contract and its current commitments General Experience Experience in Power Sector under contracts in the role of contractor, subcontractor, or…

Idioma de este anuncio: English. El título y la descripción se muestran tal como los publicó el órgano de contratación.