Out For Tender

Out For Tender › États-Unis › Travaux de construction

FY27 McConnell AFB - Multiple Award Construction Contract (MACC)

Acheteur
FA4621 22 CONS PK, Dept of Defense
Pays
États-Unis
Catégorie
Travaux de construction
Date limite
Clôture dans 5 jours (7 Oct 2026 14:00 UTC-5)
Publié le
25 Sep 2026
Procédure
Solicitation - Small Business Set Aside - Total

Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.

Ce que l'acheteur demande

Amendment 2 - The purpose of this amendment is to: 1. Extended the proposal due date from 30 September 2026 to 7 October 2026. 2. Respond to final set of questions. 3. Provide updated Attach 12 - PRQE 250006 - SOW Attach 2 - B412 Drawings based on Q&A. 4. Provide updated Attach 13 - PRQE 250006 - SOW Attach 3 - B1099 Drawings based on Q&A 5. Addition of Point of Contact in Section L.1.1.2 6. Provide updated Attach 10 - PRQE 250006 - SOW 25 Sep 26 Please note that Q&A Attachments 2, 3, and 4 are attachments that answer corresponding questions in the Q&A. * Please note that Attach 11 - PRQE 250006 - SOW Attach 1 - Specifications was changed in Amendment 1 but was not included in the summary of changes. --------------------------------------------------------------------------------------------------------------------------------------- Amendment 1 - The purpose of this amendment is to: 1) Update to R-DFARS Clause 252.204-7021 from CMMC Level 2 (C3PAO) to CMMC Level 2 (Self). 2) Update to R-DFARS Clause 252.204-7025 from CMMC Level 2 (C3PAO) to CMMC Level 2 (Self). 3) Adjusted Attach 1 General Statement of Work to include requirement in H.9.0. 4) Update to R-DFARS Clause 252.215-7012. 5) Update to SF1442 Box 13.b. 6) Update to Attach 9 changing name from Bid Schedule to Price Schedule. 7) Provide meeting minutes and information from Pre-Proposal Conference and Site Visit. 8) Respond to questions received both prior to and as follow-up from the Pre-Proposal Conference and Site Visit. 9) Adjust all question due date from five (5) business days after pre-proposal conference to seven (7) making all questions due on 21 September. 10) Add Attach 16 - Q&A Attachment 1 *Please note: There are two separate sets of Q&A. Please be sure to review all amendment attachments. Documents that are changed due to the Q&A will be provided in the next amendment. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- McConnell AFB Multiple Award Construction Contract (MACC) Solicitation FA4621-26-R-0001 The 22d Contracting Squadron (22 CONS) of the 22d Air Refueling Wing, McConnell AFB KS, hereby releases the McConnell AFB Multiple Award Construction Contract (MACC) solicitation. The Government intends to award up to seven (7) firm-fixed price Indefinite-Delivery Indefinite-Quantity (IDIQ) contracts while identifying up to three (3) on-ramp vendors. The Government shall issue task orders for individual construction projects based upon a competition amongst the successful awardees. Task orders issued under this contract shall be Firm Fixed Price with a magnitude between $2,000.00 and $10,000,000.00. The total amount of this contract is not-to-exceed a monetary amount of $99,000,000.00 or a term of six-years (as extended through the exercise of options), whichever is reached first. The seven (7) initial contract awards will contain a basic 24-month period of performance and two (2) subsequent options with 24-month periods of performance to be exercised at the Government’s discretion. A seed project for this contract has been identified and can be found in the Request for Proposal (RFP) and attachments 9-14. The work consists of a wide variety of construction tasks, including design and build; renovation; additions and upgrades; new construction integrating multiple construction trades and disciplines; and repair and replacement of roadways, airfield taxi-ways and runways. Successful awardees shall be capable of providing a full project design from concept or a performance-oriented statement of work. The contractor shall provide all materials, labor, equipment, tools, transportation and ancillary items necessary to complete each project from conception to completion. The requirement is being procured in accordance with the procedures in RFO Part 15, R-DFARS part 215, and DoD Source Selection Procedures. The Government intends to issue…

Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.

Source: SAM · reference FA462126R0001 · JSON