Out For Tender

Out For Tender › États-Unis › Travaux de construction

WWYK240052 Renovate Hallway, 1AB1-103C, 1AB1-108B, B3001

Acheteur
FA8137 AFSC PZIOC, Dept of Defense
Pays
États-Unis
Catégorie
Travaux de construction
Date limite
Clôture dans 4 jours (30 Sep 2026 14:00 UTC-5)
Publié le
7 Aug 2026
Procédure
Combined Synopsis/Solicitation - Small Business Set Aside - Total

Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.

Ce que l'acheteur demande

This posting is for Tinker AFB - MAC BOA Holders ONLY. Project Solicitation Number: FA813726R0049 Project Title: WWYK21038 – Renovate Hallway, 1AB1-103C, 1AB1-108B, B3001 Project Location: Tinker AFB - B3001 Repair by renovation of hallways at project location within B3001 at Tinker Air Force Base (AFB) Oklahoma 73145 The estimated project value is below $25M and is restricted to SB MAC BOA holders only. Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP and EAL if required, Initial Site Visit is set for Wednesday, August 12th at 2:00 PM CST B3001. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.

Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.

Source: SAM · reference FA813726R0049 · JSON