Out For Tender › États-Unis › Travaux de construction
Gas Leak Repair, Valve Installation, and Asphalt Patching Services
- Acheteur
- SPECIAL MISSION TRAINING CENTER (SMTC), Homeland Security, Department of
- Pays
- États-Unis
- Catégorie
- Travaux de construction
- Date limite
- Clôture dans 7 jours (12 Nov 2026 11:00 UTC-5)
- Publié le
- 2 Nov 2026
- Procédure
- Solicitation - Small Business Set Aside - Total
Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.
Ce que l'acheteur demande
Description This is a solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number 75110PR270000104 is issued as a request for quotation (RFQ) for gas-leak detection and repair, gas-valve installation, gravel backfill, asphalt patching, and site cleanup at Birmingham Southern College in Birmingham, Alabama. This acquisition is set aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01 Effective Date 03/13/2026. The associated North American Industrial Classification System (NAICS) code for this procurement is 237120, with a small business size standard of $45.0M. Product Service Code is Z2NA. Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. As a minimum, offers shall include (1) The solicitation number. (2) The name, address, telephone number of the Offeror. (3) The Offerors Unique Entity Identifier (UEI) (4) Information necessary to evaluate the factors contained in the provision at 52.212-2 (5) Responses to provisions that require Offeror completion of information, representations, and certifications (other than those collected via the System for Award Management (SAM)); and (6) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and any solicitation amendments. Period for acceptance of offers. The Offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation. The Coast Guard Training Center Birmingham Southern is seeking to purchase gas-leak repair services, including excavation, gas-line repair, gas-valve installation, testing, gravel backfill, asphalt patching, and site cleanup. All interested companies must provide quotation(s) for the following services: CLIN 0001 Gas Leak Detection, Excavation, Spoil Removal, and Gravel Backfill. The Contractor shall locate the gas leak, saw-cut and excavate the parking lot as needed, use required safety measures, remove and dispose of excavated material and debris, and place and compact clean gravel or approved backfill after repair and testing. The expected excavation area is about 6 feet by 6 feet and up to 6 feet deep. The Government will provide utility markings before excavation; however, the Contractor remains responsible for safe digging. This CLIN is associated with SOW Task 2.1, SOW Task 2.3, and SOW Section 5.0. CLIN 0002 Gas-Line Repair, Valve Installation, Testing, and Test Record. The Contractor shall provide all labor, materials, equipment, pipe, fittings, connectors, one new gas shutoff valve, and testing needed to repair the identified gas leak. The Contractor shall test the repaired gas line and valve before backfill and provide a written test record to the GTR and Contracting Officer. The Contractor shall not restart gas service until testing is successful and any required gas-utility approval is received. This CLIN is associated with SOW Task 2.2. CLIN 0003 Asphalt Repair. After the gas-line repair, testing, and backfill are complete, the Contractor shall prepare the base and install an asphalt patch. The patch shall match the existing pavement as closely as practical, be properly compacted and level with the surrounding surface, and be safe for normal parking-lot traffic. The Contractor shall seal edges and joints as needed. This CLIN is associated with SOW Task 2.3. CLIN 0004 Site Cleanup and…
Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.
How this compares
- This is one of 880 open tenders in États-Unis for Travaux de construction.
- Bidders were given 10 days from publication to the deadline; the median for open tenders in États-Unis is 21 days.
More open tenders from this buyer
Rental and maintenance of one 6,000-lb and one 12,000-lb LPG forklift
SPECIAL MISSION TRAINING CENTER (SMTC), Homeland Security, Department of
Rental and maintenance of one 6,000-lb and one 12,000-lb LPG forklift
SPECIAL MISSION TRAINING CENTER (SMTC), Homeland Security, Department of
Rental and maintenance of one 6,000-lb and one 12,000-lb LPG forklift
SPECIAL MISSION TRAINING CENTER (SMTC), Homeland Security, Department of
SPECIAL MISSIONS TRAINING CENTER LIVE-FIRE MARITIME/URBAN TRAINING SYSTEM
SPECIAL MISSION TRAINING CENTER (SMTC), Homeland Security, Department of
Similar open tenders
Z--EROS Removal and replacement of chilled and conden
OFC OF ACQUSITION GRANTS-NATIONAL, Interior, Department of the
Z--EROS Removal and replacement of chilled and conden
OFC OF ACQUSITION GRANTS-NATIONAL, Interior, Department of the
Z--EROS Removal and replacement of chilled and conden
OFC OF ACQUSITION GRANTS-NATIONAL, Interior, Department of the
Replace HVAC Rooftop Units at Building 2275
W7MX USPFO ACTIVITY CAANG 163, Dept of Defense
Z--EC-ECAO Exterior Door Replacement
RECLAMATION CONTRACTING ACTIVITY, Interior, Department of the
Source: SAM · reference 75110PR270000104 · JSON