Out For Tender › États-Unis › Travaux de construction
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
- Acheteur
- FERMILAB - DOE CONTRACTOR, Energy, Department of
- Pays
- États-Unis
- Catégorie
- Travaux de construction
- Date limite
- Clôture dans 6 jours (17 Nov 2026 16:00 UTC-6)
- Publié le
- 17 Sep 2026
- Procédure
- Solicitation - No Set aside used
Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.
Ce que l'acheteur demande
This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilabs mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilabs accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.
How this compares
- This is one of 1019 open tenders in États-Unis for Travaux de construction.
- Bidders were given 61 days from publication to the deadline; the median for open tenders in États-Unis is 17 days.
More open tenders from this buyer
Cavity
FERMILAB - DOE CONTRACTOR, Energy, Department of
Bar Grating and Saddle Clips
FERMILAB - DOE CONTRACTOR, Energy, Department of
Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade
FERMILAB - DOE CONTRACTOR, Energy, Department of
Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade
FERMILAB - DOE CONTRACTOR, Energy, Department of
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
FERMILAB - DOE CONTRACTOR, Energy, Department of
Similar open tenders
Design Build Markey DC0094ZZ Multi Floor Interior Finish Improvements
PBS PROJECT DELIVERY CENTRAL - BRANCH C, General Services Administration
Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
242-NETWORK CONTRACT OFFICE 02 (36C242), Veterans Affairs, Department of
Design Build Markey DC0094ZZ Multi Floor Interior Finish Improvements
PBS PROJECT DELIVERY CENTRAL - BRANCH C, General Services Administration
Design Build Markey DC0094ZZ Multi Floor Interior Finish Improvements
PBS PROJECT DELIVERY CENTRAL - BRANCH C, General Services Administration
OK-DEEP FORK NWR-QUARTERS HVAC REPLACEM
FWS CONTRACTING ACTIVITY, Interior, Department of the
Source: SAM · reference RFP-376508-CD · JSON