Out For Tender › États-Unis › Travaux de construction
Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ????????? Select Sites
- Acheteur
- W074 ENDIST SAVANNAH, Dept of Defense
- Pays
- États-Unis
- Catégorie
- Travaux de construction
- Date limite
- Clôture dans 20 jours (20 Nov 2026 11:00 UTC-5)
- Publié le
- 19 Oct 2026
- Procédure
- Sources Sought
Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.
Ce que l'acheteur demande
THIS IS A SOURCES SOUGHT ONLY. The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform maintenance and unclassified dredging on the Atlantic Intracoastal Waterway (AIWW) sections of waterway Hell Gate and Florida Passage in Chatham County Georgia and Fields Cut in Jasper County South Carolina. This request does not obligate the Government in any way to post a Request for Proposal or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS code is 237990 with a size standard of $45.0M. The potential magnitude for this requirement is estimated to be between $5,000,000 and $10,000,000. The FY26 Atlantic Intracoastal Waterway (AIWW) maintenance dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging and incidental related work. This contract is traditionally performed with a hydraulic cutterhead dredge, but other methods will be considered. The duration is expected to be five months (165 days) from Notice to Proceed. The Savannah Districts area of responsibility (AOR) of the federally maintained channel in the Atlantic Intracoastal Waterway begins in Port Royal Sound, South Carolina and ends in Cumberland Sound, Georgia. The shallow draft federally maintained channel is twelve (12) feet deep MLLW with widths from ninety (90) feet in land cuts and one hundred fifty (150) feet in natural waterways. Savannah Districts FY26 AIWW maintenance dredging work is located within the state of Georgia (Chatham County) and in the state of South Carolina (Jasper County). The Hell Gate section of waterway is to be dredged to authorized width of 150 feet and depth of 12 feet. The work also includes options to dredge the Florida Passage and the Fields Cut sections of the waterway to authorized width of 150 feet and depth of 12 feet. Approximately two hundred thousand (200,000) cubic yards of maintenance material is anticipated to be removed from the Hell Gate section of the federally maintained channel in the waterway. Approximately fifteen thousand (15,000) cubic yards of maintenance material is anticipated to be removed from the Florida Passage section of the federally maintained channel in the waterway. Approximately fifty thousand (50,000) cubic yards of maintenance material is anticipated to be removed from the Fields Cut section of the federally maintained channel in the waterway. Sediment dredged from Hell Gate may be pumped approximately four (4) miles to a Beneficial Use placement site in tidal flats east of Ogeechee Bar. Sediment dredged from Florida Passage may be pumped approximately nine (9) miles to the Beneficial Use placement site in the tidal flats east of Ogeechee Bar. Sediment dredged from Fields Cut will be pumped to the adjacent confined upland containment area DMCA 14B. The attached Request for Information should be filled out and loaded via PIEE before the sources sought close on 20 November 2026, 11:00 a.m. (EST). Any questions should be emailed to the Contract Specialist, Rohan Bryan at Rohan.A.Bryan@usace.army.mil or Contracting Officer, Preston Jones at Preston.E.Jones@usace.army.mil.
Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.
How this compares
- This is one of 851 open tenders in États-Unis for Travaux de construction.
- Bidders were given 32 days from publication to the deadline; the median for open tenders in États-Unis is 21 days.
More open tenders from this buyer
Tybee Island Shoreline Protection Project
W074 ENDIST SAVANNAH, Dept of Defense
Tybee Island Shoreline Protection Project
W074 ENDIST SAVANNAH, Dept of Defense
Requirement to support the Formerly Used Defense Sites (FUDS) Program Single Award Task Order Contract (SATOC)
W074 ENDIST SAVANNAH, Dept of Defense
Market Intelligence Notice Child Development Centers (CDC) - Volumetric modular housing, Kit-of-Parts facilities, 3-D Printed
W074 ENDIST SAVANNAH, Dept of Defense
Similar open tenders
Y--GLCA Hite
DSC CONTRACTING SERVICES DIVISION, Interior, Department of the
Y--COTP Series Capacitor Two-Phase Design Build
WESTERN-SIERRA NEVADA REGION, Energy, Department of
GAOA Remove and Replace Roofing on Island Park Admin Site Housing Units
USDA FOREST SERIVCE, Agriculture, Department of
RTOIL Office rehab
NAVAL AIR WARFARE CENTER, Dept of Defense
DINO REPLACE SWING ARM GATES
IMR NORTHERN ROCKIES(12200), Interior, Department of the
Source: SAM · reference W912HN27S5000 · JSON