Out For Tender › États-Unis › Travaux de construction
Forest wide Decommissioning, Gunnison National Forest Colorado
This tender has closed. It stays online as a record of what was advertised.
- Acheteur
- USDA-FS, CSA INTERMOUNTAIN 8, Agriculture, Department of
- Pays
- États-Unis
- Catégorie
- Travaux de construction
- Date limite
- Clôturé (22 Sep 2026 14:00 UTC-4)
- Publié le
- 18 Sep 2026
- Procédure
- Solicitation - Small Business Set Aside - Total
Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.
Ce que l'acheteur demande
The purpose of this amendment is the following: 1.Revision- Revision to C05_1240LT26Q0184 1442_Revised Factor 1 Technical Approach Page 20 - Removed Soap Creek amended with: Removal of toilet building located at the Ward Lake Campground, properly abandoned two water wells (Lakeview and Beaver Lake CGs), and removal of water concrete tank at Beaver Lake CG. 2. Consolidated questions and answers C06 Attach 6_Questions Answered The Grand Mesa, Uncompahgre and Gunnison National Forests are working on removing unusable structures within the forests. The work on this project will be on three different campgrounds: Ward Lake located in Delta County Colorado; Beaver Lake located in Gunnison County Colorado and Lakeview also located in Gunnison County Colorado. The project consists of removal of toilet building located at the Ward Lake Campground, properly abandoned two water wells (Lakeview and Beaver Lake CGs), and removal of water concrete tank at Beaver Lake CG.
Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.
Source: SAM · reference 1240LT26Q0177 · JSON