Out For Tender › Slovaquie › Machines, appareils, équipements et consommables électriques; éclairage
Implementation of Battery Energy Storage System at Čierny Váh
- Acheteur
- Slovenské elektrárne, a.s.
- Pays
- Slovaquie
- Catégorie
- Machines, appareils, équipements et consommables électriques; éclairage
- Date limite
- Clôture dans 27 jours (26 Nov 2026 11:00 UTC+2)
- Publié le
- 27 Oct 2026
- Procédure
- Neg-w-call
- Code CPV
- 31440000
Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.
Ce que l'acheteur demande
The subject matter of the tender comprises EPC performance of all supplies and services related to design and engineering, permitting and other engineering activities, transportation, installation, commissioning and putting into operation of the newly installed equipment. The principal scope of supply is the construction and commissioning of a Battery Energy Storage System (BESS) providing the following functions and services: • Frequency Containment Reserve (FCR); • automatic Frequency Restoration Reserve (aFRR); • market services, including Day-Ahead and Intraday market participation, energy arbitrage and imbalance management; • Limited Frequency Sensitive Mode – Overfrequency (LFSM-O) and Underfrequency (LFSM-U), providing active power response in the event of an increase or decrease in grid frequency; and • island operation to ensure the auxiliary power supply of the pumped-storage hydropower plant in the event of a loss of the 22 kV power supply. The BESS shall have a total usable energy capacity of at least 480 MWh and a rated power of at least 120 MW and shall be connected to the 400 kV substation via a newly constructed 400 kV bay. The scope of works includes all engineering and permitting activities, preparation of design documentation, civil, electrical and mechanical works, delivery and installation of battery containers, power conversion systems, energy management systems, transformers, switchgear and associated equipment. The contractor shall also ensure integration with existing plant systems, implementation of control, protection, monitoring and communication systems, fire protection and security systems, testing, commissioning, performance verification and training of operating personnel. The tenderer shall provide all documentation, certifications, inspections and services necessary to ensure safe, reliable and long-term operation of the BESS installation.
Langue de cet avis : slovenčina. Le titre et la description sont affichés tels que publiés par l'acheteur.
How this compares
- This is one of 5 open tenders in Slovaquie for Machines, appareils, équipements et consommables électriques; éclairage.
- Bidders were given 30 days from publication to the deadline; the median for open tenders in Slovaquie is 31 days.
More open tenders from this buyer
Monitorovanie plynných výpustí MO34
Slovenské elektrárne, a.s.
Realizácia núdzových východových uzáverov na únikových východoch v SE -EBO
Slovenské elektrárne, a.s.
Doplnenie obtoku katexového filtra a obtoku anexového filtra na ŠOV 2 EMO
Slovenské elektrárne, a.s.
Modernizácia systému jednotky styku s prostredím (JSP‑P) v EBO
Slovenské elektrárne, a.s.
Modernizácia bezpečnostných systémov SORR, SIS a CPL, Súťažný dialóg
Slovenské elektrárne, a.s.
Similar open tenders
Dodanie, montáž a uvedenie elektronického systému uzamykania kontajnerových boxov v Levoči do prevádzky
Mesto Levoča
„Olejová regulovateľná tlmivka 400 kV“ - dodávka
Slovenská elektrizačná prenosová sústava, a.s.
Zvýšenie podielu obnoviteľných zdrojov energie vo verejných školských budovách v meste Humenné
Mesto Humenné
Trojfázové olejové výkonové transformátory VVN/VN - spoločné obstarávanie - PCI
Západoslovenská distribučná, a.s.
Source: TED · reference 742901-2026 · JSON