Out For Tender

Out For Tender › Stati Uniti › Lavori di costruzione

Solicitation: Construct Combat Rescue Helicopter Flight Simulator Facility at Moffett ANGB

Stazione appaltante
W7MX USPFO ACTIVITY CAANG 129, Dept of Defense
Paese
Stati Uniti
Categoria
Lavori di costruzione
Scadenza
Scade tra 5 giorni (13 Nov 2026 12:00 UTC-8)
Pubblicata
15 Oct 2026
Procedura
Solicitation - Small Business Set Aside - Total

Leggi il bando ufficiale e partecipa → La presentazione delle offerte avviene sempre sul portale della stazione appaltante, mai qui.

Che cosa richiede la stazione appaltante

The Contractor shall provide non-personal services, to include all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a Combat Rescue Helicopter (CRH) Operational Flight Trainer (OFT) simulator facility at Moffett Air National Guard Base (ANGB), Mountain View, California. This project will provide an approximately 8,202 gross square foot building consisting of a multi-story, high bay area to house the CRH-OFT simulator, with a single-story area containing CRH mission planning, briefing and debriefing rooms, administrative areas for training and support staff, OFT maintenance and parts storage rooms, secure and non-secure telecommunication rooms, latrine facilities and mechanical, electrical and utility support rooms utilizing conventional design and construction. The building will be of permanent construction with electrical, mechanical, HVAC, plumbing, wet sprinkler fire suppression, fire detection, access control, direct digital control, and utility management. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Air space and insulation to be located inside the cavity wall to meet Energy Code requirements. The primary roofing materials will be standing seam metal roofing to match other installation facilities and the perimeter sloped roof design will include a prefinished standing seam metal roof panel system over rigid insulation. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Main entrance doors will be a pair of anodized aluminum storefront entrance doors with insulating glass including a sidelight. The Mechanical, Electrical, Sim Bay and secondary egress doors will be painted, insulated hollow metal door and frames with controlled access. Antiterrorism/Force Protection elements are incorporated. Supporting facilities include landscaping, utilities, pavements, storm drainage, sanitary sewer, site improvements, communications support, cybersecurity control systems, and tempest security.

Lingua di questo bando: English. Titolo e descrizione sono mostrati esattamente come pubblicati dalla stazione appaltante.

How this compares

  • This is one of 975 open tenders in Stati Uniti for Lavori di costruzione.
  • Bidders were given 29 days from publication to the deadline; the median for open tenders in Stati Uniti is 17 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference W50S8X26BA011 · JSON