Out For Tender › Stati Uniti › Lavori di costruzione
Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)
- Stazione appaltante
- FA7060 11TH CONTRACTING SQ PK, Dept of Defense
- Paese
- Stati Uniti
- Categoria
- Lavori di costruzione
- Scadenza
- Scade oggi (30 Nov 2026 10:00 UTC-5)
- Pubblicata
- 23 Oct 2026
- Procedura
- Sources Sought - No Set aside used
Leggi il bando ufficiale e partecipa → La presentazione delle offerte avviene sempre sul portale della stazione appaltante, mai qui.
Che cosa richiede la stazione appaltante
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE: This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firms ability to submit a proposal should formal solicitation be issued in the future. NAICS CODE: 238210 Electrical Contractors and Other Wiring Installation Contractors SMALL BUSINESS STANDARD: $19,000,000.00 NOTE: While Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The 11th Contracting Squadron (11 CONS), District of Washington, has a requirement to execute the design-build upgrades, repairs, and/or replacements to the deteriorated Electrical Switching Stations located at B18 and B168 on Joint Base Anacostia Bolling (JBAB) that includes developing a solution to establish a connection by high voltage electrical redundancy cable. The Government is evaluating the feasibility of executing these requirements via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a. This project summary establishes the operational requirements, technical baseline, and acquisition framework for the Progressive Design-Build (PDB) Other Transaction Authority (OTA) effort to modernize Joint Base Anacostia-Bollings (JBAB) primary electrical infrastructure. Project Title JBAB Electrical Switching Stations (ESS B18 & B168) Modernization & Grid Redundancy Location Joint Base Anacostia-Bolling (JBAB), 11th Wing Acquisition Strategy Progressive Design-Build (PDB) via Other Transaction Authority (OTA) Primary Objective Engineer comprehensive design packages to repair, upgrade, and interconnect deteriorated electrical switching infrastructure Primary Deliverables 100% executable design packages, specifications, and implementation schedules for ESS upgrades, facility hardening, cable routing, and smart-grid wireless SCADA/telemetry Scope Breakdown by Facility & Component ESS B18 (Switching Station Upgrade) Full replacement of legacy switchgear with FR3 fluid, air-insulated switchgear (per latest UFC 3-550-01) Life-cycle cost and sustainability integration (UFC 1-200-02) Thermal partition separating switchgear room from power generation bay Dedicated HVAC system and air conditioning ductwork Sized space heating units High-efficiency interior LED lighting ESS B168 (Repair, Upgrade & Hardening) Complete switchgear replacement mirroring ESS B168b using FR3 air-insulated switchgear (UFC 3-550-01) Sustainable design practices (UFC 1-200-02) Dedicated single HVAC unit and duct system Interior/exterior high-efficiency LED flood/task lighting Raised roof profile with comprehensive crack sealing/insulation Foundation pillar repairs, crawl space waterproofing, and rainwater gutter system Motorized roll-up door, cyber/physical cypher-locked access doors, and motorized loading dock ramp with widened sidewalk High-Voltage Redundancy Cables Design 4-circuit bidirectional interconnect (8 cables total) connecting ESS B18 and ESS B168 Baseline routing derived from 2025 Engineering Study Mandatory underground routing preference across base footprint Aerial routing permitted strictly as secondary exception where subsurface obstructions prevent underground installation Wireless SCADA & Grid Telemetry Air Force long-term smart-grid wireless connectivity architecture Cell-enabled control panels…
Lingua di questo bando: English. Titolo e descrizione sono mostrati esattamente come pubblicati dalla stazione appaltante.
How this compares
- This is one of 987 open tenders in Stati Uniti for Lavori di costruzione.
- Bidders were given 38 days from publication to the deadline; the median for open tenders in Stati Uniti is 19 days.
More open tenders from this buyer
Joint Base Anacostia Bolling (JBAB) School Bus Transportation Services
FA7060 11TH CONTRACTING SQ PK, Dept of Defense
Grounds Maintenance and Snow Removal Services - JBAB
FA7060 11TH CONTRACTING SQ PK, Dept of Defense
Multiple Award Construction Contract (MACC)
FA7060 11TH CONTRACTING SQ PK, Dept of Defense
PKA - USAF BAND ADVERTISING SUPPORT BPA
FA7060 11TH CONTRACTING SQ PK, Dept of Defense
Similar open tenders
RENOVATE MILITARY FAMILY HOUSING TOWER 4511, CAMP COURTNEY
W2SN ENDIST JAPAN, Dept of Defense
RENOVATE MILITARY FAMILY HOUSING TOWER 4511, CAMP COURTNEY
W2SN ENDIST JAPAN, Dept of Defense
Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B
242-NETWORK CONTRACT OFFICE 02 (36C242), Veterans Affairs, Department of
Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B
242-NETWORK CONTRACT OFFICE 02 (36C242), Veterans Affairs, Department of
Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B
242-NETWORK CONTRACT OFFICE 02 (36C242), Veterans Affairs, Department of
Source: SAM · reference FA706027R0001 · JSON