Out For Tender

Out For Tender › Stati Uniti › Servizi fognari, di raccolta dei rifiuti, di pulizia e ambientali

FCI MCKEAN GREASE TRAP PUMPING AND CLEANING SERVICES

Stazione appaltante
FCI MCKEAN, Justice, Department of
Paese
Stati Uniti
Categoria
Servizi fognari, di raccolta dei rifiuti, di pulizia e ambientali
Scadenza
Scade tra 13 giorni (23 Nov 2026 14:00 UTC-5)
Pubblicata
3 Nov 2026
Procedura
Combined Synopsis/Solicitation - Small Business Set Aside - Total

Leggi il bando ufficiale e partecipa → La presentazione delle offerte avviene sempre sul portale della stazione appaltante, mai qui.

Che cosa richiede la stazione appaltante

**AMMENDMENT 1. REMOVED INCORRECT WAGE DETERMINATION AND UPLOADED CORRECT WAGE DETERMINATION*** **AMMENDMENT 2. UPLOADED AMENDMENT DOCUMENT 15B20927Q00000001 P00001 RFQ GREASE TRAP.pdf THIS DOCUMENT UPDATES THE OPTION YEARS IN LINE ITEMS 2 THROUGH 5. TO BEGIN ON OCTOBER 1 INSTEAD OF DECEMBER. UPDATED TERMS AND CONDITIONS. ADDED 52.217-9 AND REMOVED 52.226-3. **** The Federal Bureau of Prisons intends to establish a contract for the provision of Grease Trap Cleaning Services. Services are to be performed on-site at FCI McKean. Place of Performance Place of Performance will be located at FCI McKean, 6975 Route 59 Lewis Run, PA 16738. Schedule The contractor will provide grease trap cleaning and waste disposal at the scheduled times below. The specific days for performance of these services will be established after contract award. The contractor will be required to provide these services on an estimated two to three month interval between the hours of 7:30AM-3:00PM, Monday through Friday, excluding Federal holidays. The exact intervals between cleanings will be determined as needed by the Contracting Officer’s Representative (COR). FCI McKean has one 10,000 gallon trap within the secure confines behind the Food Service department, and one 2,000 gallon trap at the satellite prison camp. All grease and pumpings removed shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. The contractor shall furnish an invoice for each service delivered at the time of extraction. All extractions and cleanings will be verified and signed for by an authorized representative. Specific Requirements The contractor will be licensed/permitted by the State of Pennsylvania and will provide evidence of proper waste disposal, in accordance with all current Federal, State, and local codes, laws, and requirements regarding the disposal of solid waste. Supplies and Equipment The contractor will provide the truck, labor, and equipment necessary for effective removal, transportation/disposal of waste. All material located within the container upon removal become the property and responsibility of the contractor to dispose of in a lawful manner. Description of Duties The contractor has sole responsibility and discretion for choosing and implementing the manner and method of performing tasks outlined in the Statement of Work as long as the requirements are met in accordance with the policies described above. The services, although not directly supervised, shall be reviewed by institution staff to ensure contract compliance. Contractor performance will be monitored by the COR and evaluated in accordance with FAR Part 42. Institution Security The contractor agrees to adhere to all regulations prescribed by the institution for the safety, custody, and conduct of inmates. Access to the containers will be available only during the scheduled hours, unless prior approval of the COR is obtained. All contract personnel that are entering the secure confines of the institution are required to have a clear NCIC background check.While on institution grounds and prior to departure, the operator, equipment, and vehicle shall be subject to security checks and inspections. The Government reserves the right for security reasons to prohibit certain vendor employees from entering the facility. Due to the nature of the correctional setting, delays in performance of work may be expected. Such delays may include but are not limited to inclement weather, electrical or mechanical problems, or other security matters. When the contractor reports to the institution on a scheduled pickup but is unable to performance services due to such delays, the contractor will be paid for their time in the form of a predetermined trip fee. The unperformed pickup may be rescheduled at the BOP’s discretion or may be performed on the next regularly scheduled pickup. Charges for the trip fee should be represented as separate line item charges on each invoice.…

Lingua di questo bando: English. Titolo e descrizione sono mostrati esattamente come pubblicati dalla stazione appaltante.

How this compares

  • This is one of 257 open tenders in Stati Uniti for Servizi fognari, di raccolta dei rifiuti, di pulizia e ambientali.
  • Bidders were given 20 days from publication to the deadline; the median for open tenders in Stati Uniti is 18 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference 15B20927Q00000001 · JSON