Out For Tender

Out For Tender › Verenigde Staten › Diensten voor land-, bos- en tuinbouw, aquicultuur en imkerij

Groundwater Monitoring in Wabasha County, MN

Aanbestedende dienst
W07V ENDIST ST PAUL, Dept of Defense
Land
Verenigde Staten
Categorie
Diensten voor land-, bos- en tuinbouw, aquicultuur en imkerij
Sluitingsdatum
Sluit over 6 dagen (18 Nov 2026 11:00 UTC-6)
Gepubliceerd
3 Nov 2026
Procedure
Solicitation - Small Business Set Aside - Total

Lees de officiële aankondiging en schrijf in → Inschrijven gebeurt altijd op het portaal van de aanbestedende dienst, nooit hier.

Wat de aanbestedende dienst vraagt

The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section.

Taal van deze aankondiging: English. Titel en beschrijving tonen we precies zoals de aanbestedende dienst ze heeft gepubliceerd.

How this compares

  • This is one of 105 open tenders in Verenigde Staten for Diensten voor land-, bos- en tuinbouw, aquicultuur en imkerij.
  • Bidders were given 15 days from publication to the deadline; the median for open tenders in Verenigde Staten is 18 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference W912ES27QA013 · JSON