Out For Tender › Verenigde Staten › Structuren en materialen voor de bouw; ondersteunende producten voor de bouw (uitgezonderd elektrische apparatuur)
H53K HMH462 Japan Snap On Tooling
- Aanbestedende dienst
- NAVAIR WARFARE CTR AIRCRAFT DIV, Dept of Defense
- Land
- Verenigde Staten
- Categorie
- Structuren en materialen voor de bouw; ondersteunende producten voor de bouw (uitgezonderd elektrische apparatuur)
- Sluitingsdatum
- Sluit vandaag (24 Sep 2026 17:00 UTC-4)
- Gepubliceerd
- 9 Sep 2026
- Procedure
- Combined Synopsis/Solicitation - No Set aside used
Lees de officiële aankondiging en schrijf in → Inschrijven gebeurt altijd op het portaal van de aanbestedende dienst, nooit hier.
Wat de aanbestedende dienst vraagt
The Naval Air Warfare Center Aircraft Division, Lakehurst (NAWCAD LKE) intends to solicit, negotiate, and award a firm-fixed-price contract on a limited competition basis to procure 26 unique H53K tool groupings equaling a total of 206 kits between two sites with an option for an extra 103 kits for a future site in support of the Prototype, Manufacturing, and Development Program (PMD) See Attachment A for the complete part list. This limited competition will be between IDSC Holdings LLC and Snap-on Tools (CAGE: 55719) and their authorized distributors using FAR Part 12 and FAR Part 13 procedures. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Award shall be made to the offeror whose quotation is deemed technically acceptable and is lowest price. The Government will evaluate quotations based on the following evaluation criteria: 1) Technical Description; and, 2) Price. 1. Technical Description: The Government will evaluate whether the quoter has included a technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation, including the attached parts list. Quotations that do not include a technical description of the items being offered or do not include a technical description of the items being offered in sufficient detail to evaluation compliance with the requirements in the solicitation, including the attached parts list will not be considered for award. 2. Price: The Government will evaluate price for reasonableness. The total evaluated price will be the sum of all CLINs for each part number listed in the attachment 001 CLIN structure spreadsheet. The proposed prices will be evaluated to determine if the Offerors prices are fair and reasonable. Delivery shall be FOB Destination (FAR 52.247-34). Early deliveries are acceptable at no additional cost to the Government. The anticipated delivery date is 120 days after receipt of order and ship to address is as follows: NAVAIR Warfare CTR Aircraft DIV LKE HWY 547 BLDG 148, MCC1 Lakehurst , NJ 08733 Note that this is strictly a limited competition between IDSC Holdings LLC/Snap-on Tools and their authorized distributors. Vendors that are not the original end manufacturer will be required to demonstrate their capacity as an authorized distributor for their quote to be considered for award. The Government will consider all responses received within fifteen days after the date of publication of this synopsis. A determination by the Government not to open the requirement to competition based upon responses to this notice is solely within the discretion of the Government. Information received as a result of the notice of intent will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. No solicitation will be available for this procurement. The offeror certifies that they will deliver items no later than 120 days after the receipt of an order. [Note: earlier delivery at no additional charge to the Government is acceptable and encouraged]. Shipping must be Free on Board (FOB) destination CONUS (Continental U.S.), which means that the seller must deliver the goods on its conveyance at the destination specified by the buyer, and the seller is responsible for the cost of shipping and risk of loss prior to actual delivery at the specified destination. All applicable shipping costs should be included in the unit prices of the equipment. Payment Terms shall be NET 30. The offeror certifies that the quote will be valid for 90 days. By responding to this combined synopsis & solicitation, the Offeror certifies that that they can meet the following requirements as part of the Governments responsibility determination and can provide…
Taal van deze aankondiging: English. Titel en beschrijving tonen we precies zoals de aanbestedende dienst ze heeft gepubliceerd.
Source: SAM · reference N6833526R0526 · JSON