Out For Tender

Out For Tender › Verenigde Staten › Bouwwerkzaamheden

Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for Information

Aanbestedende dienst
FA9401 377 MSG PK, Dept of Defense
Land
Verenigde Staten
Categorie
Bouwwerkzaamheden
Sluitingsdatum
Sluit over 7 dagen (19 Nov 2026 16:30 UTC-7)
Gepubliceerd
6 Nov 2026
Procedure
Sources Sought - No Set aside used

Lees de officiële aankondiging en schrijf in → Inschrijven gebeurt altijd op het portaal van de aanbestedende dienst, nooit hier.

Wat de aanbestedende dienst vraagt

This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future. Please note that while Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The U.S. Air Force 377th Contracting Division has a requirement to execute the construction and technical redesign requirements for the demolition of three substations and new construction of two upgraded substations. The services requested will include new 12.47 kV distribution systems. The primary purpose and objective of these projects are to rapidly upgrade the existing infrastructure, meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. The Government is evaluating the feasibility of executing these requirements under one award via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a. Summaries of projects for this acquisition strategy are as follows: - MHMV200009 – Repair Substation 9 and Feeders: The primary objective of the Repair Substation 9 and Feeders project is to design and construct a fully operational, modern power distribution asset, upgrading the existing infrastructure to meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. This goal will be achieved by establishing the new substation facility within a defined 100ft x 150ft footprint directly south of the existing location, and installing all-new substation components, security fencing, distribution poles, switching gear, and conductors. The project also aims to complete the systematic teardown and removal of all retired infrastructure to restore the original site. - MHMV 120009 – Remove Substation 23 & Connect Loads to Substation 24A Feeder 5: The project entails the design and construction services required to remove Substation 23 & connect loads to Substation 24A Feeder 5 located on KAFB. The primary purpose and objective of this project is to upgrade the existing infrastructure of Substation 24A Feeder 5 to meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. - MHMV080002 – Demo Substation 3, Rebuild Substation 10 and Distribution System: The primary goal of the Demo Substation 3, Rebuild Substation 10 and Distribution System project is to safely decommission and demolish Substations 3 and 10 and design, construct, and commission a modern, consolidated Substation 10 rated at 10,000 KVA (10/12/14 MVA). This infrastructure upgrade will replace aged, unserviceable assets with a resilient, high-capacity substation and an underground distribution backbone designed to eliminate single points of failure and modernize base electrical infrastructure. Included in this notice are the attachments of the Scope of Services with technical documents for more detailed information on the nature of the work. INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy. Please limit your responses to no more than 5-pages addressing the following questions – - Company Profile: Business Name Address Point of Contract (Name, Title) Phone Number Email Address Cage Code & UEI - Relevant Experience: Please provide…

Taal van deze aankondiging: English. Titel en beschrijving tonen we precies zoals de aanbestedende dienst ze heeft gepubliceerd.

How this compares

  • This is one of 996 open tenders in Verenigde Staten for Bouwwerkzaamheden.
  • Bidders were given 13 days from publication to the deadline; the median for open tenders in Verenigde Staten is 18 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference MHMV200009-MHMV120009-MHMV08002 · JSON