Out For Tender › Verenigde Staten › Reparatie- en onderhoudsdiensten
USCGC HEALY CO2 Pull System Upgrade
This tender has closed. It stays online as a record of what was advertised.
- Aanbestedende dienst
- SFLC PROCUREMENT BRANCH 2(00085), Homeland Security, Department of
- Land
- Verenigde Staten
- Categorie
- Reparatie- en onderhoudsdiensten
- Sluitingsdatum
- Gesloten (25 Sep 2026 08:00 UTC-7)
- Gepubliceerd
- 21 Sep 2026
- Procedure
- Combined Synopsis/Solicitation - Small Business Set Aside - Total
Lees de officiële aankondiging en schrijf in → Inschrijven gebeurt altijd op het portaal van de aanbestedende dienst, nooit hier.
Wat de aanbestedende dienst vraagt
General Requirements 1. SCOPE 1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels. 2. REFERENCES COAST GUARD DRAWINGS None COAST GUARD PUBLICATIONS Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response OTHER REFERENCES None 3. REQUIREMENTS 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract. 3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment. 3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740. 3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550 3.5. Period of Performance. The period of performance for this work starts on 01 Oct 26 and ends on 31 Oct 2026. 3.6. Location. The Contractor must perform the work while the USCGC HEALY is alongside the pier at Coast Guard Base Seattle 3.7 Ship-check. It is highly recommended the Contractor conducts a ship-check to propose the best routing for the new pull cables. The Generator rooms have many interferences to consider during the planning. The cutter will be available from 21 to 25 Sep 2026 for ship-checks at Seattle WA. Interested contractors must contact the POC's to coordinate a ship's visit. 3.8 Ship-check will be at no cost to the government. Points of Contact: MKCM Armando Perez (Armando.Perez@uscg.mil) USCGC Engineer Officer: LCDR Trey Thunborg (Trey.A.Thunborg@uscg.mil). WORK ITEM 1: Fire Pull, Replace 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to replace the manual fire pulls connecting the Engineering Control Center (ECC) (01-105-0-C) to the CO2 system for Generator Room 1 (1-80-1-E) and Generator Room 2 (1-80-2-E). The CO2 bottles and actuation system are located in the CO2 Room (1-65-1-K) 1.2 Government-furnished property. None 2. REFERENCES COAST GUARD DRAWINGS Coast Guard Drawing 420-WAGB-079-002, Rev (-), Damage Control Diagrams Coast Guard Drawing 420-WAGB-555-009, Rev B, CO2 System Piping Mods Coast Guard Drawing 420-WAGB-635-001, Rev D, Insulation Layouts & Dets Coast Guard Drawing 420-WAGB-801-001, Rev K, Booklet of General Drawings COAST GUARD PUBLICATIONS Coast Guard Technical Publication (TP) 5207, 2003, Fire Extinguishing System, High Pressure Carbon Dioxide Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures OTHER REFERENCES None 3. REQUIREMENTS CLIN 001 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. The Contractor must provide the services of a Technical Representative who is a certified distributor of Kidde Products and a Factory Certified Technician for Kidde products to accomplish the following on site: . Provide manufacturer's proprietary system/ equipment information, software, and tools. . Assist with installation and testing of the equipment/system. . Ensure compliance with manufacturer's procedures…
Taal van deze aankondiging: English. Titel en beschrijving tonen we precies zoals de aanbestedende dienst ze heeft gepubliceerd.
Source: SAM · reference 70Z08526Q0028325 · JSON