Consultancy service for Feasibility Study & Detail Designs for Nine (9) Groundwater Investigation for Borehole Drilling of Harwo,Dambal(two sites),Hadagalo, Shilabo (two sites),Lagahida, Mayumuluko & Dunyar project woredas
- Aanbestedende dienst
- Somali Regional Project Coordination Unit
- Land
- Ethiopië
- Sluitingsdatum
- Sluit over 20 dagen (4 Dec 2026 09:00 UTC-8)
- Gepubliceerd
- 13 Nov 2026
- Procedure
- Quality And Cost-Based Selection
Lees de officiële aankondiging en schrijf in → Inschrijven gebeurt altijd op het portaal van de aanbestedende dienst, nooit hier.
Wat de aanbestedende dienst vraagt
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION) FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA LOWLANDS LIVELIHOOD RESILIENCE PROJECT – PHASE II (LLRP-II) Credit No.: 7519-ET Assignment Title: Consultancy Services for Hydrogeological and Geophysical Investigation for Groundwater Development at Nine (9) Drilling Locations in Dunyar, Shilabo (two sites), Dambel, Guradhamole, Lagahida, Mayamuluko, Harawo and Hadhagala Woredas, Somali Regional State Reference No .: ET-SOM-RPCU-570299-CS-QCBS The Federal Democratic Republic of Ethiopia has received financing from the International Development Association (IDA) of the World Bank and the International Fund for Agricultural Development (IFAD) for the Lowlands Livelihood Resilience Project – Phase II (LLRP-II) and intends to use part of the proceeds for consulting services. The consulting services (“the Services”) include hydrogeological and geophysical investigations to identify, assess and recommend technically feasible, sustainable, climate-resilient, environmentally sound and socially acceptable groundwater drilling sites for water supply (domestic and livestock) and, where applicable, irrigation development at nine (9) drilling locations in eight (8) woredas of Somali Regional State, namely: Dunyar Woreda, Siti Zone (Asli kebele); Shilabo Woreda, Korahey Zone (Qudha’shir and Miyir Kaynan kebeles – two sites); Dambel Woreda, Siti Zone (Dalamane kebele); Guradhamole Woreda, Liban Zone (Dektah kebele); Lagahida Woreda, Erer Zone (Busa kebele); Mayamuluko Woreda, Erer Zone (Magaalacad kebele); Harawo Woreda, Siti Zone (Darcade kebele); and Hadhagala Woreda, Siti Zone (Geedwayn kebele). The Client may adjust the final locations and number of sites during implementation depending on field conditions and project priorities. The Services comprise: review of existing information and preparation of an Inception Report (including a data gap register, stakeholder engagement plan and security management plan); reconnaissance survey and baseline assessment, including mapping of seasonal livestock migration routes, grazing areas, existing water points and customary water rights; stakeholder consultation, conducted in the Somali language, with pastoral and agro-pastoral communities, customary institutions, women, youth and vulnerable groups; hydrogeological mapping, including assessment of transboundary aquifers; estimation of groundwater potential, recharge and likely yields using empirical and analogue methods; geophysical surveys (a minimum of three Vertical Electrical Soundings per site, i.e. at least twenty-seven (27) VES) and their interpretation, with a primary and at least one alternative drilling point for each site; sampling of existing water points and laboratory analysis for drinking, livestock and irrigation suitability; environmental and social impact assessment in accordance with the World Bank Environmental and Social Framework (ESF) and IFAD requirements, including preparation of Environmental and Social Management Plans (ESMPs); uncertainty, data gap and risk management, including site confidence classification, site risk registers and a decision matrix presented at a validation workshop; groundwater development planning; establishment of a GIS database and maps; capacity building of Client staff; estimation of the drilling contract period; and preparation of preliminary engineering recommendations, draft bidding documents based on the World Bank Standard Procurement Documents (technical specifications, drawings and bills of quantities, including drilling-risk provisions) and the Engineer’s cost estimate for the subsequent borehole drilling and test pumping works. The assignment is a pre-drilling investigation based on desk study, field reconnaissance, hydrogeological mapping, geophysical surveys, sampling of existing water points and empirical estimation. It does not include test well (exploratory borehole) drilling, borehole construction or pumping tests,…
Taal van deze aankondiging: English. Titel en beschrijving tonen we precies zoals de aanbestedende dienst ze heeft gepubliceerd.
How this compares
- Bidders were given 21 days from publication to the deadline; the median for open tenders in Ethiopië is 21 days.
More open tenders from this buyer
"Consultancy service for Feasibility Study & Detail Designs for Medium Span Bridges and Gravel Access Road in Aware, Kubi, Hadagalo & Hamaro and Guredamole, Mubarak, El-Ogaden, Hararey, Dambal & Shilabo Projects Woredas "
Somali Regional Project Coordination Unit
Consultancy service for Feasibility Study & Detail Designs for Nine (9) Groundwater Investigation for Borehole Drilling of Bilcilbur,Dagahmadow,Goljano,Shabeley, Danot(two sites),Kohle, Mula & Daror project woredas
Somali Regional Project Coordination Unit
Source: WORLDBANK · reference OP00481408 · JSON