Out For Tender

Out For TenderStany ZjednoczoneRoboty budowlane

GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

Zamawiający
USDA FOREST SERVICE, Agriculture, Department of
Kraj
Stany Zjednoczone
Kategoria
Roboty budowlane
Termin składania ofert
Kończy się za 6 dni (30 Sep 2026 15:00 UTC-6)
Opublikowano
17 Sep 2026
Procedura
Combined Synopsis/Solicitation - Small Business Set Aside - Total

Przeczytaj oficjalne ogłoszenie i złóż ofertę → Oferty składa się zawsze na portalu zamawiającego, nigdy tutaj.

Czego szuka zamawiający

On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013. 2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013. This amendment must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.” This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.

Język tego ogłoszenia: English. Tytuł i opis pokazujemy dokładnie tak, jak opublikował je zamawiający.

Source: SAM · reference 1240BH26R0013 · JSON