Out For Tender › Estados Unidos › Construção
Market Survey: Design and Construction of Prefabricated Metal Storage Garage - Boise Air Traffic Control Tower (Gowen Field), Boise, ID
- Entidade adjudicante
- 697DCK REGIONAL ACQUISITIONS SVCS, Transportation, Department of
- País
- Estados Unidos
- Categoria
- Construção
- Prazo
- Termina em 9 dias (14 Oct 2026 17:00 UTC-6)
- Publicado
- 24 Sep 2026
- Procedimento
- Sources Sought - Small Business Set Aside - Total
Ler o anúncio oficial e concorrer → As propostas são sempre apresentadas no portal da entidade adjudicante, nunca aqui.
O que a entidade adjudicante procura
1. Introduction To support acquisition strategy development and assess commercial marketplace capabilities, the Federal Aviation Administration (FAA) is seeking interested sources capable of designing and constructing a finished pre-engineered metal storage garage at the Boise Air Traffic Control Tower (ATCT). This Market Survey is issued in accordance with FAA Acquisition Management System (AMS) Policy 3.2.1.2.1 to solicit statements of interest and capabilities. Estimated Project Value Range: $450,000.00 - $650,000.00 Place of Performance: Boise Air Traffic Control Tower (ATCT) / Gowen Field 2901 Ed Stimpson Way, Boise, ID 83642 2. Project Description & Scope of Work The Federal Aviation Administration (FAA), Mobile Asset Program, has a requirement to design and construct a finished pre-engineered metal storage garage (PEMB) at the Boise Air Traffic Control Tower (Gowen Field). The new facility will serve as an unstaffed equipment storage building to house and protect large mobile equipment trailers. Specific work items and technical parameters include: Building Structure & Dimensions: Design, fabricate, deliver, and erect a 53'-0" W x 90'-0" L x 18'-0" Eave Height (5,208 sq. ft.) gable Pre-Engineered Metal Building (PEMB) capable of meeting 2018 International Building Code (IBC) standards and 115 mph wind speeds (Exposure C). Floor-to-ceiling interior clearance shall be not less than 14 feet above the floor slab. Slab & Substructure Foundation: Utilize the existing 53' x 90' concrete slab/ramp as the finished floor. Clean, pressure wash, and apply a high-grade clear penetrating concrete sealer (epoxy not required). Construct a new reinforced concrete perimeter foundation outside the footprint of the existing slab, consisting of 20 augered cylindrical piers (30" diameter x 6'-0" deep) spaced at 10'-0" O.C., a 3'-0" high perimeter concrete skirt/stem wall, and 4" concrete infill between the existing curb and new skirt wall. Building Access & Overhead Doors: Furnish and install two (2) 16'-2" W x 14'-1" H commercial insulated sectional roll-up doors (R-12.76 rating) on the east (53') facade with manual chain hoists, designed to accommodate large mobile asset trailers. Provide two (2) interior manual chain hoists for equipment handling. Install two (2) 3'-0" x 7'-0" hollow metal personnel egress doors with panic hardware (one on the east face between the roll-up doors, and one on the south face). Thermal Envelope & Environmental Controls: Install full R-11 roof and wall blanket insulation with white/reflective foil vapor retarder facing. Equip the facility with interior unit heating for freeze protection, passive/active exhaust ventilation fans with automated louvers, and complete perimeter joint caulking and elastomeric weather sealing. Electrical & Exterior Lighting: Install commercial LED exterior wall-pack luminaires above bay openings and access doors, connected to the adjacent facility overhead/underground electrical power feed. Civil & Asphalt Paving Work: Design and construct heavy-duty asphalt paving adjacent to the east bay doors to facilitate heavy trailer maneuvering into storage bays. Grade earthwork around the perimeter skirt wall for positive surface drainage away from the structure. Implement SWPPP measures during construction. (Sub-surface drainage piping, domestic water, and plumbing are explicitly excluded). The anticipated performance schedule is ninety (90) calendar days / twelve (12) weeks from the issuance of the official Notice to Proceed (NTP). The award will be made under a firm-fixed-price (FFP) contract structure. 3. Disclaimer This announcement is a Market Survey only and does not constitute a Screening Information Request (SIR) or Request for Proposal (RFP). The Federal Aviation Administration (FAA) is neither seeking nor accepting unsolicited proposals. Responses to this Market Survey will be used to evaluate industry capabilities and may be used to establish a qualified vendors list for this…
Idioma deste anúncio: English. O título e a descrição são apresentados tal como a entidade adjudicante os publicou.
Source: SAM · reference 697DCK-27-R-00025 · JSON