Out For Tender › Estados Unidos › Estruturas e materiais de construção; produtos auxiliares de construção (excepto aparelhos eléctricos)
FLEXIBLE RUBBER PIPE COUPLINGS
- Entidade adjudicante
- CG-SEA-C21, Homeland Security, Department of
- País
- Estados Unidos
- Categoria
- Estruturas e materiais de construção; produtos auxiliares de construção (excepto aparelhos eléctricos)
- Prazo
- Termina em 11 dias (18 Nov 2026 15:00 UTC-5)
- Publicado
- 2 Nov 2026
- Procedimento
- Combined Synopsis/Solicitation - Small Business Set Aside - Total
Ler o anúncio oficial e concorrer → As propostas são sempre apresentadas no portal da entidade adjudicante, nunca aqui.
O que a entidade adjudicante procura
Solicitation Modification 002: This amendment establishes the pre-award ship-check and field measurement requirements, clarifies the award consideration during technical evaluation, and the missing additional FAR clauses and provisions. 1. Pre-Award Ship Check and Field Measurements The Government does not possess reliable existing measurements; therefore, the performance requirement remains valid. Accordingly, offerors shall complete a ship check and conduct the necessary field measurements specified in the SOW, no later than November 16th, 2026, prior to the solicitation closing date of November 18th, 2026. This includes visually inspecting each of the twenty-four (24) target locations, verifying face-to-face dimensions, flange drilling patterns, allowable lateral/axial movement, adjacent clearances, and piping alignment necessary for off-site fabrication. Due to operational commitments and cutter availability, post-award access for obtaining measurements will not be feasible. Offerors are responsible for coordinating and completing any necessary ship check and field measurements before the established deadline to ensure their proposals are accurate and technically compliant. Requiring completion during the established availability window mitigates fabrication inaccuracies, improper fitting, schedule delays, and performance risk associated with the required delivery date of April 12, 2027. 2. Technical Evaluation and Award Eligibility Completion of the pre-award ship check and field measurements is a mandatory technical acceptability requirement. Offerors shall provide documentation of the completed site visit a technical approach, and technical capability demonstrating that their proposed offer is based on verified measurements meeting the SOW requirements. As previously stated, Firm Fixed Price Proposals shall be detailed and include information from the SOW demonstrating an understanding of all the requirements in the SOW. Proposals that fail to demonstrate compliance with this requirement by the established deadline will be determined technically unacceptable and ineligible for award, regardless of price. 3. Required Delivery Date The RDD remains on or before April 12, 2027. Offerors shall demonstrate their ability to fabricate and deliver the required components within the timeframe based on the verified ship-check measurements and anticipatory delivery date. 4. Additional FAR clauses and provisions. The original solicitation mentioned additional FAR clauses and provisions that was identified as missing. These have been included in an attachment as previously stated. All other terms and conditions of the solicitation remain unchanged. The solicitation closing date and time of 18 November 2026 at 3:00 P.M. Eastern Standard Time remain unchanged. It is the responsibility of interested vendors to monitor the solicitation for any amendments, modifications, or other changes. End of Modification 002. ----------------------------------------------------------------------------------------------------------------- Solicitation Modification 001: This solicitation amendment is to address the Statement of Work file attachment. Multiple interested vendors reported not being able to review the SOW word doc file format. The SOW attachment has been uploaded under PDF file format. All other terms and conditions of the solicitation remain unchanged. The solicitation closing date and time of 18 November 2026 at 3:00 P.M. Eastern Standard Time remain unchanged. It is the responsibility of interested vendors to monitor the solicitation for any amendments, modifications, or other changes. End of Modification 001. ----------------------------------------------------------------------------------------------------------------- Availability of a site visit will be held between October 26, 2026, and November 16, 2026 . RSVP to the POC CWO Nicholas Labianca, Port Engineer, Email: Nicholas.F.Labianca@uscg.mil or Phone: (571) 608-9794, Deadline…
Idioma deste anúncio: English. O título e a descrição são apresentados tal como a entidade adjudicante os publicou.
How this compares
- This is one of 1136 open tenders in Estados Unidos for Estruturas e materiais de construção; produtos auxiliares de construção (excepto aparelhos eléctricos).
- Bidders were given 16 days from publication to the deadline; the median for open tenders in Estados Unidos is 17 days.
More open tenders from this buyer
CGC DILIGENCE TUG SERVICES
CG-SEA-C21, Homeland Security, Department of
CGC DILIGENCE TUG SERVICES
CG-SEA-C21, Homeland Security, Department of
PUMP UNIT CENTRIFUGAL
CG-SEA-C21, Homeland Security, Department of
USCGC DOLPHIN FUEL TANK CLEANING
CG-SEA-C21, Homeland Security, Department of
USCGC DOLPHIN FUEL TANK CLEANING
CG-SEA-C21, Homeland Security, Department of
Similar open tenders
ELBOWS AND STRAINERS
CG-SEA-C23, Homeland Security, Department of
HOOK, LATCH, AIRCRAFT
DLA WEAPONS SUPPORT, Dept of Defense
F100CoreModuleContainer_End_Item_F100_NSN_8145014524579NZ_PN_P4078843
DLA AVIATION AT OKLAHOMA CITY, OK, Dept of Defense
TUBE ASSEMBLY, METAL_End_Item_F100_NSN_4710003266453NZ_PN_4036628
DLA AVIATION AT OKLAHOMA CITY, OK, Dept of Defense
Aggregate Stone Material - Fort Riley, Kansas
W6QM MICC-FT RILEY, Dept of Defense
Source: SAM · reference 52000QR2700000374 · JSON