Out For Tender

Out For Tender › Estados Unidos › Construção

GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

Entidade adjudicante
USDA FOREST SERVICE, Agriculture, Department of
País
Estados Unidos
Categoria
Construção
Prazo
Termina em 5 dias (30 Sep 2026 15:00 UTC-6)
Publicado
4 Aug 2026
Procedimento
Combined Synopsis/Solicitation - Small Business Set Aside - Total

Ler o anúncio oficial e concorrer → As propostas são sempre apresentadas no portal da entidade adjudicante, nunca aqui.

O que a entidade adjudicante procura

This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.

Idioma deste anúncio: English. O título e a descrição são apresentados tal como a entidade adjudicante os publicou.

Source: SAM · reference 1240BH26R0013 · JSON