Out For Tender › Estados Unidos › Máquinas industriais
4420--SPS Steam Water Heater (Equipment) - VAMC Chillicothe
This tender has closed. It stays online as a record of what was advertised.
- Entidade adjudicante
- 250-NETWORK CONTRACT OFFICE 10 (36C250), Veterans Affairs, Department of
- País
- Estados Unidos
- Categoria
- Máquinas industriais
- Prazo
- Encerrado (23 Sep 2026 15:00 UTC-4)
- Publicado
- 21 Sep 2026
- Procedimento
- Combined Synopsis/Solicitation - Small Business Set Aside - Total
Ler o anúncio oficial e concorrer → As propostas são sempre apresentadas no portal da entidade adjudicante, nunca aqui.
O que a entidade adjudicante procura
The purpose of this amendment is to post questions received and provide the facilities responses. The response date and time remain unchanged. 1. DELIVERY / LEAD TIME SOW paragraph 4 requires all wetted parts to be 316 or 316L stainless steel on an ASME-stamped packaged unit. Manufacturers we have approached indicate this is a made-to-order build rather than a catalog item, with fabrication lead times that may exceed the 90-day period of performance stated in paragraph 11. Will the Government accept a quoted delivery beyond 90 days after receipt of order where the vendor identifies the lead time in its quotation, or should quoters plan to invoke the 14-day notification provision in paragraph 11 after award? The facility has indicated either is sufficient. Please submit the most accurate delivery schedule possible with your quote. 2. SCOPE OF "ALL WETTED PARTS" Please confirm whether the 316/316L stainless requirement extends to the heat exchanger tube bundle and circulating pump, or whether it applies to the vessel, connections and wetted piping with a copper-alloy tube bundle remaining acceptable. Several standard packaged units meet every other requirement in paragraph 4 but use a copper U-bend coil or bronze circulator. Tube-bundle must be stainless steel, as copper piping is not compatible with low conductivity water. 3. CONTROL VALVE CONFIGURATION Paragraph 4 requires 1/3-2/3 control valves. Please confirm whether the control valves are to be pneumatic, electronic, or vendor's choice, and whether any BAS/BMS interface or signal type is required at the control panel. Electronic controls. BAS interface functionality (integration is not within scope) would be preferable but not required. 4. SOLICITATION NUMBER IN THE DESCRIPTION The first paragraph of the attached OPPORTUNITIES-DESCRIPTION 02 document references "solicitation number 36C25026Q1034" and also refers to providing "a Reverse Osmosis system." The CLIN schedule, Statement of Work, title and submission instructions all reference 36C25026Q1040 and two packaged steam water heaters. Please confirm that 36C25026Q1040 is the correct solicitation number and that the Reverse Osmosis reference is not part of this requirement. Reverse Osmosis system is a different requirement and not associated with 36C25026Q1040, which is limited to the two packaged steam water heaters. Paragraph is hereby corrected to: The contractor shall include all labor, materials, equipment, and shipping to comply with all applicable federal, state, local laws and regulations, and VA regulations as required to provide two packaged steam water heaters as outline in the SOW/SCHEDULE.: 5. INSTALLATION SOW paragraph 3 states that equipment install and testing are not within the scope of this contract. Please confirm that the vendor's responsibility ends at delivery to the Building 23 Warehouse with cut sheets and O&M manuals furnished, and that no rigging, setting, startup or commissioning labor is to be priced. Correct, install and setup is not required. 6. PAST PERFORMANCE Please confirm the number of past performance references desired, the relevancy period, and whether commercial references are acceptable alongside federal references. Past performance can be reviewed via CPARS. There is no specific number of references required. 7. EXISTING EQUIPMENT If available, please provide the make and model of the existing end-of-life units being replaced, and any connection sizes or physical envelope constraints in the Sterile Processing mechanical space, so that quoted units can be confirmed as a fit. Current system is an electric tank-based water heater at end of life. New water heater is being installed parallel to existing prior to cut over. Physical constraints limited to passage through standard height (84 inch) double door.
Idioma deste anúncio: English. O título e a descrição são apresentados tal como a entidade adjudicante os publicou.
Source: SAM · reference 36C25026Q1040 · JSON