Out For Tender

Out For Tender › Estados Unidos › Construção

Z2DA--666-27-102 Lightning Protection Update B71N

This tender has closed. It stays online as a record of what was advertised.

Entidade adjudicante
NETWORK CONTRACT OFFICE 19 (36C259), Veterans Affairs, Department of
País
Estados Unidos
Categoria
Construção
Prazo
Encerrado (30 Oct 2026 10:00 UTC-6)
Publicado
26 Oct 2026
Procedimento
Solicitation

Ler o anúncio oficial e concorrer → As propostas são sempre apresentadas no portal da entidade adjudicante, nunca aqui.

O que a entidade adjudicante procura

GENERAL: Introduction: An inspection for current code compliance of the lightning Protection System on Building 71N has been conducted and found the system needs upgrades and repairs to meet current NFPA 780 and UL96A standards. The Sheridan VA Medical Center needs the services of a qualified contractor to perform the needed lightning protection upgrades to the main hospital building 71N. Located on the Sheridan Wyoming Veterans Affairs Medical Center (VAMC) campus, at 1898 Fort Road, Sheridan, Wyoming 82801. Statement of Work: Specifics a. Existing Conditions The existing lightning protection system (LPS) for Building 71N was installed in 1989 during the building s original construction. Overall, the system remains in fair condition, though it requires repair because several air terminals have become detached from their adhesive bonds to the roof surface. Air terminals are present at all high points of the structure, and all roof-mounted equipment and appurtenances are properly grounded. A main grounding bus connects the communication systems and possibly the electrical distribution system to the primary service ground. The specific location where the grounding system bonds together the structural steel, electrical system, lightning protection components, and plumbing to create an equipotential ground could not be identified during the assessment. A continuous grounding loop encircles Buildings 9, 71, and 71N, with all roof air terminals and down conductors tied into this loop. Down conductors descend to the loop at the corners of each of these buildings. Each air terminal has at least two separate grounding paths, satisfying current code requirements. No Transient Voltage Surge Suppression (TVSS) devices were observed in the system. The lower 8 feet of the ground down conductors are encased in PVC electrical conduit for protection. New Construction Recent construction has added large equipment and a screen wall to the roof, which now obstructs and interferes with the original positioning of the existing air terminals. This new equipment sits higher than the existing lightning protection system components, rendering the current air terminals ineffective at intercepting and safely directing lightning strikes to ground. Project Requirements To bring the existing lightning protection system (LPS) into compliance the following corrections are needed: Install Transient Voltage Surge Suppression (TVSS) devices at the building s main service panel. Establish proper bonding by interconnecting all electrical systems, communication systems, piping, and structural steel at the service entrance to create an equipotential ground. Repair all roof air terminals that have detached or pulled away from their adhesive mounts on the roof surface. Install new air terminals at both ends of each screen wall, with additional terminals spaced at 20-foot intervals along the top of each wall, and at the highest point of the HVAC ductwork. Install an air terminal at each corner of the new HVAC equipment. Connect all newly installed air terminals to the existing LPS using #2 bare copper conductors. After these corrections have been completed, a qualified inspection is required to verify full compliance with NFPA 780 and UL 96A standards. Upon successful inspection, a Master Label Certificate should be issued for the lightning protection system. General: Construction project is to be completed within 120 calendar days from date of Notice to Proceed (NTP). Contractor shall provide all equipment, materials, supplies, tools, software, supervision, and labor required for this project, which may include, but is not limited to, demolition work, providing negative pressure environment for work, and providing all new equipment, utilities, and room finishes as indicated in the plans and this SOW per VA construction standards. Safety submittals shall be completed and approved prior to the commencement of on-site construction work. Material selection submittals…

Idioma deste anúncio: English. O título e a descrição são apresentados tal como a entidade adjudicante os publicou.

How this compares

  • This is one of 854 open tenders in Estados Unidos for Construção.
  • Bidders were given 4 days from publication to the deadline; the median for open tenders in Estados Unidos is 21 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference 36C25926Q0880 · JSON