Out For Tender

Out For Tender › Estados Unidos › Construção

STA Sand Key Repair Fuel Lines and Tank

Entidade adjudicante
BASE MIAMI BEACH, Homeland Security, Department of
País
Estados Unidos
Categoria
Construção
Prazo
Termina em 6 dias (13 Nov 2026 15:00 UTC-5)
Publicado
29 Oct 2026
Procedimento
Combined Synopsis/Solicitation - Small Business Set Aside - Total

Ler o anúncio oficial e concorrer → As propostas são sempre apresentadas no portal da entidade adjudicante, nunca aqui.

O que a entidade adjudicante procura

COMBINED SYNOPSIS / SOLICITATION NOTICE Commercial Products and Commercial Services / Simplified Acquisition Procedures (In accordance with FAR Subpart 12.6 and FAR Part 13 / FAR Subpart 36.2 as applicable) GENERAL INFORMATION • Action Code: Combined Synopsis/Solicitation • Document Type: Combined Synopsis/Solicitation Notice • Solicitation Number: 30321PR270000001 • Notice Date: 10/29/2026 • Set-Aside Status: Total Small Business Set-Aside • Primary NAICS Code: 237120 – Oil and Gas Pipeline and Related Structures Construction • Small Business Size Standard: $45.0 Million (for NAICS 237120) • Product Service Code (PSC): Z2PZ – Repair or Alteration of Other Utilities POINTS OF CONTACT Contracting Officer’s Representative: MKC Zachery Little Email: Zachery.T.Little@uscg.mil Phone: (417) 612-3258 SECTION 1: SYNOPSIS & DESCRIPTION This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued separately. The Department of Homeland Security, United States Coast Guard (USCG), has a requirement for repair, remediation, testing, and coating of fuel lines, storage tanks, and associated fuel system infrastructure located at USCG Station Sand Key, Clearwater, Florida. The Government intends to award a single, Firm-Fixed-Price (FFP) contract resulting from this request for quotation (RFQ). SECTION 2: PLACE OF PERFORMANCE & OPERATIONAL HOURS • Location: United States Coast Guard Station Sand Key 1375 Gulf Boulevard Clearwater, FL 33767 • Operating Hours: Normal base operating hours are 0700 to 1700 (7:00 AM – 5:00 PM), Monday through Friday, excluding federal holidays. Any work required outside these hours must receive prior written coordination and approval from the Contracting Officer’s Representative (COR). • Continuity of Operations: Station Sand Key is an active, operational military facility. The contractor shall coordinate all operations with the unit to ensure the station does not lose the capability to fuel operational vessels during the execution of repairs. SECTION 3: SUMMARY SCOPE OF WORK (SOW) DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD STATION SAND KEY SPECIFICATIONS FOR Repair Fuel Lines & Tank General: United States Coast Guard Station Sand Key requesting repair work to be completed on various fuel lines and fuel related systems. Location: United States Coast Guard Station Sand Key. 1375 Gulf Boulevard Clearwater, FL 33767 I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 0700 to 1700 Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative. II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work. III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities. MKC Zachery Little Zachery.T.Little@uscg.mil 417-612-3258 IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in Station dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety…

Idioma deste anúncio: English. O título e a descrição são apresentados tal como a entidade adjudicante os publicou.

How this compares

  • This is one of 935 open tenders in Estados Unidos for Construção.
  • Bidders were given 15 days from publication to the deadline; the median for open tenders in Estados Unidos is 20 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference 30321PR270000001 · JSON