Out For Tender › Estados Unidos › Construção
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT
- Entidade adjudicante
- W2SD ENDIST NEW ENGLAND, Dept of Defense
- País
- Estados Unidos
- Categoria
- Construção
- Prazo
- Termina em 7 dias (18 Nov 2026 17:00 UTC-5)
- Publicado
- 10 Nov 2026
- Procedimento
- Solicitation - Small Business Set Aside - Total
Ler o anúncio oficial e concorrer → As propostas são sempre apresentadas no portal da entidade adjudicante, nunca aqui.
O que a entidade adjudicante procura
The U.S. Army Corps of Engineers - New England District is issuing a Solicitation Notice for Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT. THE WORK CONSISTS OF: The Contractor shall furnish all necessary materials, equipment, and labor required to construct and commission a new power system for the Dike B Operator unit. The scope of work involves comprehensive site preparation to support the construction of a reinforced concrete generator pad and the installation of secure perimeter fencing. The Contractor is responsible for the procurement and installation of a standalone, propane-powered generator and a corresponding propane fuel storage tanks. Following the physical installation, the Contractor shall execute all final electrical connections and integration into the existing sluice gate operator unit and control panel. All work shall comply with all applicable federal laws and codes, and shall be completed in accordance with the Statement of Work. This procurement is set-aside for small business vendors. The applicable NAICS code is 238290 with a Small Business Size Standard of $22 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
Idioma deste anúncio: English. O título e a descrição são apresentados tal como a entidade adjudicante os publicou.
How this compares
- This is one of 1019 open tenders in Estados Unidos for Construção.
- Bidders were given 8 days from publication to the deadline; the median for open tenders in Estados Unidos is 17 days.
More open tenders from this buyer
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT
W2SD ENDIST NEW ENGLAND, Dept of Defense
Snow Removal Services, Westville Lake, Southbridge, MA
W2SD ENDIST NEW ENGLAND, Dept of Defense
Snow Removal Services, Westville Lake, Southbridge, MA
W2SD ENDIST NEW ENGLAND, Dept of Defense
Snow Removal Services, Westville Lake, Southbridge, MA
W2SD ENDIST NEW ENGLAND, Dept of Defense
Snow Removal Services, Westville Lake, Southbridge, MA
W2SD ENDIST NEW ENGLAND, Dept of Defense
Similar open tenders
Design Build Markey DC0094ZZ Multi Floor Interior Finish Improvements
PBS PROJECT DELIVERY CENTRAL - BRANCH C, General Services Administration
Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
242-NETWORK CONTRACT OFFICE 02 (36C242), Veterans Affairs, Department of
Design Build Markey DC0094ZZ Multi Floor Interior Finish Improvements
PBS PROJECT DELIVERY CENTRAL - BRANCH C, General Services Administration
Design Build Markey DC0094ZZ Multi Floor Interior Finish Improvements
PBS PROJECT DELIVERY CENTRAL - BRANCH C, General Services Administration
OK-DEEP FORK NWR-QUARTERS HVAC REPLACEM
FWS CONTRACTING ACTIVITY, Interior, Department of the
Source: SAM · reference W912WJ27QA001 · JSON