Out For Tender › UNITED KINGDOM › Industrial machinery
Boiler Room Upgrade at Kensington Palace
- Buyer
- The Royal Household
- Country
- UNITED KINGDOM
- Category
- Industrial machinery
- Value
- £325k GBP
- Deadline
- Closes in 26 days (11 Dec 2026 11:00 UTC+0)
- Published
- 13 Nov 2026
- Procedure
- Open
- CPV code
- 42160000
Read the official notice and bid → Bidding always happens on the buyer's own portal, never here.
What the buyer is asking for
The works are located within the Boiler Room serving the offices in apartments at Kensington Palace. The project comprises the replacement of the existing end-of-life atmospheric gas boilers with new high-efficiency condensing boilers, together with the installation of new hot water cylinders, associated pipework, valves and plate heat exchangers. The new heating system shall be designed to facilitate future connection to a heat network, which is currently being investigated through a joint RHPS/HRP feasibility study. The existing boiler flues, originally designed for atmospheric boilers, shall be surveyed and either replaced or relined as required to suit the new plant. The Contractor shall also assess the adequacy of the existing gas supply and undertake any necessary upgrades, including the replacement of obsolete mechanical gas drop safety valves with modern electrically operated solenoid valves. The works shall include, but not be limited to: •Removal and disposal of existing boilers, associated plant and redundant equipment. •Installation, testing and commissioning of new condensing boilers. •Installation of new hot water cylinders, plate heat exchangers, pipework, valves and associated ancillaries. •Survey, replacement and/or relining of existing flues as required. •Upgrades to the gas supply infrastructure where necessary. •Removal and replacement of all electrical installations and equipment required to serve the new plant. •Cleaning, flushing and dosing of the existing heating system to protect both the new plant and retained system components. •Replacement of all thermostatic radiator valves (TRVs) and lockshield valves. •Associated builders' work, making good and redecoration of the plant room upon completion of the works. •Testing, commissioning and provision of all relevant certification, operation and maintenance manuals, and handover documentation. The completed installation shall provide a significantly improved level of energy efficiency compared with the existing system while maintaining reliable heating and hot water services and enabling future integration with a district heat network.
How this compares
- This is one of 6 open tenders in UNITED KINGDOM for Industrial machinery.
- Its stated value is higher than 40% of the 5 open tenders in this category that state a value in GBP.
- Bidders were given 28 days from publication to the deadline; the median for open tenders in UNITED KINGDOM is 30 days.
Similar open tenders
Replacement of Steam Boilers
MHRA
Box-Making Machine Replacement
National Records of Scotland
Acquisition, Hire and Servicing and Repair of Manual Handling Equipment
Ministry of Justice
Crane Provision Framework
KBS Maritime Ltd
TEC Partnership - Replacement of Lift Gear at East Riding College Bridlington
TEC Partnership
Source: FTS · reference ocds-h6vhtk-07bb55 · JSON