Out For Tender › United States › Repair and maintenance services
JBPHH CAR WASH FABRIC TENSION STRUCTURE
- Buyer
- COMMANDER NAVY INSTALLATIONS CMD, Dept of Defense
- Country
- United States
- Category
- Repair and maintenance services
- Deadline
- Closes today (14 Nov 2026 15:00 UTC-6)
- Published
- 13 Nov 2026
- Procedure
- Solicitation
Read the official notice and bid → Bidding always happens on the buyer's own portal, never here.
What the buyer is asking for
The project involves the repair and upgrade of the car wash area, including the installation of fabric tension shade structures over the auto detailing area, existing vending machines, pay stations at both entrances to the car wash, and the water reclamation and oil-water separator systems. The surrounding area around building B75065H will be repaved, with careful attention given to a historic train track located on the site. The repaving will be carried out without obstructing the track, ensuring it remains exposed and at its original elevation. The work will also feature striping, directional arrows, STOP markings, and one-way asphalt painting to enhance traffic flow and safety throughout the area. ONLY DESIGN WILL BE AWARDED UNTIL ENVIRONMENTAL APPROVALS ARE RECIEVED. DESIGN: Shading Structure: a. The design will include three options focused on optimizing traffic flow around the carwash to prevent congestion and enhance accessibility. Additionally, the steel framework and fabric cover will be engineered to meet Hawaiis storm and wind load requirements, including design wind speeds up to 145 mph and compliance with impact resistance standards for windborne debris. Safety factors for structural stability, drainage, and flood resistance will also be incorporated. Final ratings and requirements will be confirmed during the design phase in coordination with local authorities and engineers to ensure compliance and durability. b. A custom design of the steel framework and fabric cover shall be developed to ensure durability, aesthetic appeal, while also providing the storm rating of the product. The structural design shall be engineered to accommodate the required load, as well as to withstand wind and weather conditions, ensuring long-term performance and stability. c. The contractor shall provide a warranty for the structure and tension fabric, ensuring protection against defects such as corrosion or structural failure. The entire structure, including the fabric membrane, shall be warranted for a minimum service life of 10 years. Covering issues like UV degradation or tearing. The tensioning system, including cables and fittings, shall be covered for 10 years against failure. Regular maintenance, including cleaning and inspections, shall be required to maintain the warranty, and exclusions shall apply for damage caused by extreme weather, misuse, or neglect. Paving & Traffic markings and Signage: a. The Offeror shall provide all design and construction services necessary to mill down three inches of the existing pavement and repave approximately 52,000 sq ft around the car wash building B75065H (J-3 (P0-1)). It is important to note that no digging permit will be issued for this project, so all work must be limited to milling and repaving without any subsurface excavation. b. The Contractor shall ensure the finished service drive allows for positive drainage away from the structures on site. c. The Contractor shall coordinate with the POC and the Local Fire Department for all flame producing / burning activities required by this SOW and shall pay for and procure all required permits prior to construction. d. The Contractor shall provide a warranty on all material and labor for a period of one year (longer if standard for materials/equipment) from the date of acceptance by the POC. The contractor will utilize industry-standard paving equipment, including cold planers for milling, asphalt pavers for laying new pavement, and rollers for compaction, ensuring all equipment meets manufacturer specifications to support the quality and durability of the work under warranty. e. The contractor shall include in the design all necessary drawings that reflect lane striping, directional arrows, STOP markings, and one-way asphalt painting details. This includes clearly marking traffic lanes with the appropriate solid and dashed lines and placing arrows to indicate the correct direction of traffic flow. CONSTRUCTION: Shading Structure: a. The…
How this compares
- This is one of 442 open tenders in United States for Repair and maintenance services.
- Bidders were given 1 days from publication to the deadline; the median for open tenders in United States is 18 days.
More open tenders from this buyer
Monterey Golf Range Technology
COMMANDER NAVY INSTALLATIONS CMD, Dept of Defense
Monterey Golf Range Technology
COMMANDER NAVY INSTALLATIONS CMD, Dept of Defense
MilLife Learning Management System Support Service
COMMANDER NAVY INSTALLATIONS CMD, Dept of Defense
Similar open tenders
Boise VA Security Equipment & Software Service Maintenance
260-NETWORK CONTRACT OFFICE 20 (36C260), Veterans Affairs, Department of
7th Fleet Welder Qualification and Sustained Capability Program
NAVSUP FLT LOG CTR YOKOSUKA, Dept of Defense
7th Fleet Welder Qualification and Sustained Capability Program
NAVSUP FLT LOG CTR YOKOSUKA, Dept of Defense
7th Fleet Welder Qualification and Sustained Capability Program
NAVSUP FLT LOG CTR YOKOSUKA, Dept of Defense
7th Fleet Welder Qualification and Sustained Capability Program
NAVSUP FLT LOG CTR YOKOSUKA, Dept of Defense
Source: SAM · reference NAVMWR-26-R-0013 · JSON