Out For Tender › United States › Construction work
Grissom ARB, IN SABER - SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS
- Buyer
- FA4654 434 CONF LGC, Dept of Defense
- Country
- United States
- Category
- Construction work
- Deadline
- Closes in 6 days (30 Sep 2026 10:00 UTC-4)
- Published
- 2 Sep 2026
- Procedure
- Sources Sought
Read the official notice and bid → Bidding always happens on the buyer's own portal, never here.
What the buyer is asking for
SOURCES SOUGHT SYNOPSIS SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER) Grissom Air Reserve Base, Indiana Reference Number: FA465426RFI0003 NAICS Code: 236220 Commercial and Institutional Building Construction Size Standard: $45.0 Million Socioeconomic Target: Competitive 8(a) / Small Business Set-Aside Determination 1.0 INTRODUCTION & PURPOSE The 434th Contracting Flight (434 CONF/PK) at Grissom Air Reserve Base (ARB), Indiana, is conducting market research to identify capable, qualified, and experienced Small Business sourcesspecifically SBA Certified 8(a), HUBZone, Service-Disabled Veteran-Owned (SDVOSB), and Women-Owned Small Businesses (WOSB)capable of performing a Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract. This is a Sources Sought Synopsis for planning and market research purposes only. This is not a Request for Proposal (RFP), and no contract will be awarded directly from this posting. 2.0 PROJECT DESCRIPTION & ACQUISITION STRATEGY 2.1 Scope of Work The Grissom ARB SABER contract will provide a rapid, highly flexible vehicle to execute a broad range of multi-trade maintenance, repair, minor construction, and renovation projects on military real property. Core capabilities required include, but are not limited to: carpentry, roofing, excavation, interior/exterior electrical, plumbing, HVAC, masonry, demolition, concrete, and localized hazardous material abatement. The anticipated contract structure is a single-award IDIQ with a 5-year ordering period and a maximum ceiling of $9,000,000. The minimum order threshold will be $2,000, which will also serve as the minimum contract guarantee to be obligated at basic contract award. 2.2 Pricing Mechanism & Database Specifications To drastically accelerate procurement lead times and eliminate the heavy administrative burden on the Civil Engineering Squadron, Grissom ARB intends to utilize a streamlined, coefficient-only price evaluation model (Weighted Coefficient Formula) for source selection. The Government will not utilize a traditional "mock project" during the evaluation phase. To execute this "no mock project" model legally and defensibly under FAR Part 16 and Part 36, the Government intends to utilize the proprietary Gordian Construction Task Catalog (CTC) / eGordian estimating database, or a technically equal pre-priced unit price database. Technical Justification for Database Specification (The "Why"): Minimization of Non-Prepriced Items (NPIs): Standard commercial cost databases (such as standard flat RSMeans, e4Clicks, or adjacent cost books) typically contain only 60,000 to 85,000 generalized, national-average tasks. This limited scope leads to severe NPI "creep" (frequently exceeding 3040% of task order values), which forces the Government into extensive, post-award, line-item negotiations and manual competitions, defeating the primary speed purpose of a SABER contract. Technical Equivalence Threshold (275,000+ Localized Tasks): To support a "no mock project" model, the database must be comprehensive enough to pre-price virtually all anticipated work. The Gordian CTC provides over 275,000+ highly detailed, client-specific line items where labor, material, and equipment costs are researched, verified, and localized specifically for the Grissom ARB, Indiana market. Prevention of Unbalanced Bidding: Standard databases require separate, manual calculations for demolition, quantity discounts, and modifiers. The Gordian CTC pre-incorporates quantity discounts and demolition costs directly into its line-item structures. This high level of granularity prevents contractors from exploitatively lowballing standard-hour coefficients and recovering margins through unpriced NPIs, after-hours markups, or modifications. Contractor-Provided Software & Overhead Absorption: To facilitate joint-scoping, the awarded contractor will be required to obtain, maintain, and fund all licensing…
Source: SAM · reference FA465426RFI0003 · JSON