Out For Tender › United States › Construction structures and materials; auxiliary products to construction (except electric apparatus)
53--HELICAL SPRING
- Buyer
- NAVSUP WEAPON SYSTEMS SUPPORT MECH, Dept of Defense
- Country
- United States
- Category
- Construction structures and materials; auxiliary products to construction (except electric apparatus)
- Deadline
- Closes in 11 days (16 Nov 2026 16:30 UTC-4)
- Published
- 16 Oct 2026
- Procedure
- Solicitation
Read the official notice and bid → Bidding always happens on the buyer's own portal, never here.
What the buyer is asking for
CONTACT INFORMATION|4|N743.43|WWU|771-229-0569|NOELLE.M.SMITH10.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|SEE SPECIFICATIONS SECTION C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The hour and date specified for receipt of offers has been extended to 4:30PM EST on 16 November 2026. 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (210 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;B; applies to this material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are…
How this compares
- This is one of 913 open tenders in United States for Construction structures and materials; auxiliary products to construction (except electric apparatus).
- Bidders were given 31 days from publication to the deadline; the median for open tenders in United States is 21 days.
More open tenders from this buyer
12--PERISCOPE,TUBE,OUT
NAVSUP WEAPON SYSTEMS SUPPORT MECH, Dept of Defense
12--PERISCOPE,TUBE,OUT
NAVSUP WEAPON SYSTEMS SUPPORT MECH, Dept of Defense
20--WINDOW ASSEMBLY,HEA
NAVSUP WEAPON SYSTEMS SUPPORT MECH, Dept of Defense
12--PERISCOPE,TUBE,OUT
NAVSUP WEAPON SYSTEMS SUPPORT MECH, Dept of Defense
1355-01-620-4752 CWRT Wire Coil, Short
NAVSUP WEAPON SYSTEMS SUPPORT MECH, Dept of Defense
Similar open tenders
Sch. 80 A53B Seamless, Pipe
W6QM MICC-FT DRUM, Dept of Defense
GASKETS
CG-SEA-C21, Homeland Security, Department of
Body, Retainer, and Gasket
NSWC INDIAN HEAD DIVISION, Dept of Defense
BULK CEMENT FOR SILO
W6QM MICC-FT DRUM, Dept of Defense
Body, Retainer, and Gasket
NSWC INDIAN HEAD DIVISION, Dept of Defense
Source: SAM · reference N0010426QFF78 · JSON