Out For Tender

Out For Tender › United States › Repair and maintenance services

Gathright Dam Motor Control Center Electrical Repairs in Covington, Virginia

Buyer
W2SD ENDIST NORFOLK, Dept of Defense
Country
United States
Category
Repair and maintenance services
Deadline
Closes in 7 days (19 Nov 2026 17:00 UTC-5)
Published
4 Nov 2026
Procedure
Sources Sought

Read the official notice and bid → Bidding always happens on the buyer's own portal, never here.

What the buyer is asking for

THIS IS A SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A REQUEST FOR PROPOSALS. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS, NOR DRAWINGS AVAILABLE AT THIS TIME. The U.S. Army Corps of Engineers – Norfolk District is anticipating a future procurement for a firm-fixed-price construction contract for the Gathright Dam Motor Control Center Electrical Repairs Project in Covington, Virginia. Description of Work: The United States Army Corps of Engineers, Norfolk District, is seeking eligible firms capable of performing motor power, control, and instrumentation electrical renovations for the intake tower located at Gathright Dam, Virginia. The primary electrical scope entails the replacement of existing 480-volt motor control centers (designated MCC2 and MCC3) with new motor control centers complete with starters, controls, incoming and outgoing feeders, incoming and outgoing conduits, control circuits, and field wiring. Incidental work includes contractor field verification of conduit pathways, replacement of conduits directly affected by equipment replacements or compromised by corrosion in accordance with the conduit and cable schedule, and the replacement in-kind of transformer XFMR-3. In addition, the project requires the comprehensive replacement and modernization of the facility control system. Work includes the demolition of existing control panels, power panels, and communication panels, followed by the installation of new Programmable Logic Controller (PLC) panels, Remote Input/Output (RIO) panels, Human-Machine Interface (HMI) screens, and all associated network wiring, cabling, and conduit infrastructure. Work to include replacement of the instrumentation for the wet well gate displacement (linear displacement sensors) to be tied into the new control system and updates to lighting to manage the nearing end-of-life of the old metal-halide high bay lights and fluorescent wallpack lights. The contractor will also be responsible for programming the new PLCs and reprogramming the existing Sutron system. All operations must be carefully phased and coordinated, as facility buildings will remain occupied throughout the duration of contract performance. There is also a bid option for a warehouse-style high bay luminaire lifting mechanism at a low-enough power-per-luminaire to tie into the associated existing lighting circuit. The estimated construction price range for this project is between $1,000,000.00 and $5,000,000.00. NAICS Code 238210, Electrical Contractors and Oher Wiring Installation Contractors, applies to this project with a small business size standard of $19,000,000.00. PSC J061, Maintenance, Repair, and Rebuilding of Equipment – Electric Wire and Power Distribution Equipment, applies to this project. The Government is not obligated to and will not pay for any information received from potential sources as a result of this sources sought. Construction Time: The construction period of performance will be approximately 360 calendar days from issuance of the Notice to Proceed (NTP). The official synopsis citing the solicitation number will be issued on System for Award Management (SAM) at www.sam.gov. INDUSTRY SURVEY The following confidential survey questionnaire is designed to apprise the Corps of prospective contractors' project execution capabilities. Please provide your response to the following questions. All questions are in regard to the Gathright Dam Motor Control Center Electrical Repairs in Covington, Virginia. Firm's response to this Synopsis shall be limited to 5 pages and shall include the following information. 1. Firm's name, address, point of contact, phone number, and e-mail address. 2. Firm's interest in bidding on the solicitation when it is issued. 3. Firm's capability to perform a contract of this magnitude and complexity (include firm's capability to execute construction, comparable work performed within the past 5 years): Brief description of the project, (customer name, timeliness of…

How this compares

  • This is one of 476 open tenders in United States for Repair and maintenance services.
  • Bidders were given 15 days from publication to the deadline; the median for open tenders in United States is 20 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference W9123627X1CW9 · JSON