Out For Tender

Out For TenderUnited StatesConstruction work

Barrow Observatory Flooring Replacement

Buyer
DEPT OF COMMERCE NOAA, Commerce, Department of
Country
United States
Category
Construction work
Deadline
Closes today (24 Sep 2026 15:00 UTC-4)
Published
18 Sep 2026
Procedure
Solicitation - Small Business Set Aside - Total

Read the official notice and bid → Bidding always happens on the buyer's own portal, never here.

What the buyer is asking for

Replacement of flooring at the NOAA Barrow Observatory in Utqia?vik, AK. Read the attached solicitation for details. Wage Determination AK20260001 added through Amendment 1. Attachment 5 - Bathroom Dimensions added through Amendment 2. Bathroom dimensions are approximately 12'x7'. Summary of the damage: Under Building: A cracked p trap in the floor drain was the cause. The P trap primer dripped into the cracked trap for an unknown amount of time. The vapor barrier on the bottom of the building held the water from the trap primer and allowed it to spread to an area of at least 8’x12’, under the building but probably more. Likely not more than 20'x20'. When removed the insulation in this area was soaked and frozen about 1.5” up from the bottom. When the soffits were opened to inspect the issue it was discovered that the flooding extended into the bays beyond where the P trap repair was to be made. Plumbing repairs were made to the p trap. Inside Building: The ?” subfloor is warped around the toilet and floor drain from flooding, sheet vinyl flooring is uneven. 1 ? subfloor is good. Vinyl sheets are about 12’x6’, warping is right on the seam of the vinyl sheets. Warping has improved as things have dried and the room has been used, but slight deflection is noticable in bathroom vinyl.

Source: SAM · reference 1333MJ26Q0077 · JSON