Procurement of consultancy services for the feasibility study, detailed design, tender document preparation, construction supervision and contract administration for the Gidabo irrigation project an area of 3,000 ha. (west guji zone, abaya woreda)
- Buyer
- Ministry of Irrigation and Lowlands
- Country
- Ethiopia
- Deadline
- Closes in 10 days (5 Oct 2026 04:30 UTC-7)
- Published
- 15 Sep 2026
- Procedure
- Quality And Cost-Based Selection
Read the official notice and bid → Bidding always happens on the buyer's own portal, never here.
What the buyer is asking for
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION) Federal Democratic Republic of Ethiopia Ministry of Irrigation and Lowlands Project: Climate Resilient Irrigation for Sustainable Production (CRISP) Credit No .: IDA- P182114 Assignment Title : Consultancy services for the feasibility study, detailed design, tender document preparation, construction supervision, & contract administration for the Gidabo Left Bank New Irrigation Development project, an area of 5,000ha for the Feasibility Study and 1,000ha for the Detailed Design Procurement Reference No.: ET-MOIL-544259-CS-QCBS The Federal Democratic Republic of Ethiopia has received financing from the World Bank toward the cost of the Climate Resilient Irrigation for Sustainable Production (CRISP) Project. The implementing agency, the Ministry of Irrigation and Lowlands, intends to apply part of the proceeds for the consulting service. The consulting service (‘the service’) includes conducting the feasibility study, detailed design, tender document preparation, construction supervision, & contract administration for the Gidabo Left Bank New Irrigation Development project, an area of 5,000ha for the Feasibility Study and 1,000ha for the Detailed Design. The Objective of the Assignment: The objectives of this consultancy service shall include the following major categories, but not limited to: Conduct Feasibility Study Prepare detail design Prepare tender Document Provide Contract Administration and Construction Supervision for the Gidabo Left Bank Irrigation Scheme. Scope of the service: The scope of the consultancy services comprises, but is not limited to: Several basin-wide and scheme-specific studies have been conducted for the Rift Valley basin and Gidabo- left bank, as well as the bigger Gidabo (including Gidabo right bank). The consultant will make use of this information/data from all available sources through desk-work, combined with the initial two days of field visits and beneficiary consultation meetings at the Gidabo irrigation scheme, which will serve as a base to prepare the Inception Report. Conduct feasibilitylevel field surveys, investigations, and explorations for 5,000 ha of the Gidabo irrigation scheme on the Oromia side. This area comprises new, previously undeveloped (virgin) land that requires pumping due to elevation differences. It is located on the left bank of the already-constructed, concrete-lined main canal, which will also be investigated by the consultant. Carry out technical, economic/financial, social, and environmental analysis, among others, to come up with clear recommendations for the optimal crop and irrigation and drainage technology options selection and prepare a complete set of feasibility report to irrigate 5,000 ha. Once MILLs validate the feasibility study report, see Section 7 schedule of reporting, undertake detailed design level surveys and technical investigations (as detailed in Section 7) for 1,000ha with a focus on the feasibility level selected irrigation and drainage technology option. This includes determining optimal pump intake location and investigating improvement needs (including safety) of the main canal upstream of the intake. Given that the development of a number of irrigation schemes benefiting from the same dam and main canal is planned or progressing, the assignment includes assessing their implication and ensuring water availability in all circumstances. Prepare detailed design, engineering drawings, and bid document to irrigate 1,000ha as well as the improvements needed along the above-mentioned main canal. This includes specifying pump capacities and power requirements, optimal energy source, as well as specifying/quantifying irrigation equipment, locating sources of construction materials, proposing construction/installation method, and preparing engineering cost estimates (including O&M costs). Undertake contract management and construction supervision of 1,000ha modernized…
Source: WORLDBANK · reference OP00468424 · JSON