Out For Tender

Out For Tender › Vereinigte Staaten › Bauarbeiten

Munitions Maintenance and Inspection (M&I) Facility & Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HI

This tender has closed. It stays online as a record of what was advertised.

Auftraggeber
W7M4 USPFO ACTIVITY HIANG 154, Dept of Defense
Land
Vereinigte Staaten
Kategorie
Bauarbeiten
Frist
Beendet (21 Sep 2026 14:30 UTC-10)
Veröffentlicht
16 Sep 2026
Verfahren
Presolicitation - Small Business Set Aside - Total

Offizielle Bekanntmachung lesen und bieten → Die Angebotsabgabe erfolgt immer auf dem Portal des Auftraggebers, niemals hier.

Was der Auftraggeber sucht

Single Project RFP Set-Aside for Small Businesses NAICS Code: 236220 – Commercial and Institutional Building Construction The Hawaii National Guard intends to issue a Request for Proposals (RFP) to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of “KNMD209085 Munitions Maintenance and Inspection (M&I) Facility” and “KNMD209086 Conventional Munitions Cube Storage Addition” located on the Hawaii Air National Guard campus, at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii. - KNMD209085 Munitions Maintenance and Inspection (M&I) Facility - Construct a new Munitions Maintenance & Inspections facility by utilizing conventional design and construction methods to accommodate the facility mission. This project has a statutory cost limitation $14M for Unspecified Minor Military Construction (UMMC) Project – Adjustment of Dollar Limitations for Location pursuant to 10 USC §2805. Project square footage is estimated at 2,400 SF. Work covered in this project includes but is not limited to: Micro-pile Foundations: Specialized foundation engineering featuring micro-piles to mitigate challenging soil conditions and ensure seismic structural integrity. Cast-in-Place Concrete: Constructing robust concrete slab-on-grade, concrete walls, capping beams, and associated structural masonry elements. Structural Framing & Enclosure: Utilizing cold-formed metal framing, insulated metal wall panels, and structural steel support systems. Roofing: Installation of high-performance standing seam metal roofing, complete with prefinished gutters, downspouts, and weather barrier wraps. Specialized Systems: Installation of mechanical HVAC systems (including specialized 20-ton air conditioning systems), interior plumbing, lightning/grounding protection, and communication infrastructure. Fire Protection: A complete fire alarm-mass notification system and wet-pipe sprinkler suppression system. In addition to the base work described above, the solicitation will include the following option line items: 1. MAC Pad - Construct 1,167 SY concrete pad for the Material Assembly Center (MAC), required for constructing munitions, along with new asphalt pavement for access and egress to the facility's maintenance bays. - KNMD209086 Conventional Munitions Cube Storage Addition - Construct an addition to the Munitions Cube Storage Facility (B3552) utilizing conventional design and construction methods to support the F-22 mission. This project has a statutory cost limitation $14M for Unspecified Minor Military Construction (UMMC) Project – Adjustment of Dollar Limitations for Location pursuant to 10 USC §2805. Project square footage is estimated at 1,320 SF. Work covered in this project includes but is not limited to: Substructure & Enclosure: Micro-pile foundations, concrete wall structures, cast-in-place concrete slabs, and 12" thick concrete walls designed for high-hazard storage specifications. Framing & Roofing: Structural steel framing, roof joists, and standing seam metal roofing matching existing facility standards. Exterior Elements: Erection of new asphalt pavement adjacent to the existing facility access to provide adequate logistics and material handling access around the new facility addition. Specialized Protection: Maintenance facility lightning and grounding protection systems, along with integrated fire detection and alarm reporting systems connected back to the base reporting system. APPLICABLE TO BOTH PROJECTS RAB Lighting exterior wall packs and area lights are sole source/brand name specific for compatibility with existing installation systems (noted justifications will be included with solicitation). Project Phasing & Security Gates: The contractor will be required to erect a temporary security fence around the construction zone in accordance with the project staging and phasing drawings. Escort…

Sprache dieser Bekanntmachung: English. Titel und Beschreibung erscheinen genau so, wie der Auftraggeber sie veröffentlicht hat.

Source: SAM · reference W50SLF-26-R-A005 · JSON