Out For Tender › Stati Uniti › Lavori di costruzione
Munitions Maintenance and Inspection (M&I) Facility & Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HI
This tender has closed. It stays online as a record of what was advertised.
- Stazione appaltante
- W7M4 USPFO ACTIVITY HIANG 154, Dept of Defense
- Paese
- Stati Uniti
- Categoria
- Lavori di costruzione
- Scadenza
- Chiusa (21 Sep 2026 14:30 UTC-10)
- Pubblicata
- 16 Sep 2026
- Procedura
- Presolicitation - Small Business Set Aside - Total
Leggi il bando ufficiale e partecipa → La presentazione delle offerte avviene sempre sul portale della stazione appaltante, mai qui.
Che cosa richiede la stazione appaltante
Single Project RFP Set-Aside for Small Businesses NAICS Code: 236220 Commercial and Institutional Building Construction The Hawaii National Guard intends to issue a Request for Proposals (RFP) to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of KNMD209085 Munitions Maintenance and Inspection (M&I) Facility and KNMD209086 Conventional Munitions Cube Storage Addition located on the Hawaii Air National Guard campus, at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii. - KNMD209085 Munitions Maintenance and Inspection (M&I) Facility - Construct a new Munitions Maintenance & Inspections facility by utilizing conventional design and construction methods to accommodate the facility mission. This project has a statutory cost limitation $14M for Unspecified Minor Military Construction (UMMC) Project Adjustment of Dollar Limitations for Location pursuant to 10 USC §2805. Project square footage is estimated at 2,400 SF. Work covered in this project includes but is not limited to: Micro-pile Foundations: Specialized foundation engineering featuring micro-piles to mitigate challenging soil conditions and ensure seismic structural integrity. Cast-in-Place Concrete: Constructing robust concrete slab-on-grade, concrete walls, capping beams, and associated structural masonry elements. Structural Framing & Enclosure: Utilizing cold-formed metal framing, insulated metal wall panels, and structural steel support systems. Roofing: Installation of high-performance standing seam metal roofing, complete with prefinished gutters, downspouts, and weather barrier wraps. Specialized Systems: Installation of mechanical HVAC systems (including specialized 20-ton air conditioning systems), interior plumbing, lightning/grounding protection, and communication infrastructure. Fire Protection: A complete fire alarm-mass notification system and wet-pipe sprinkler suppression system. In addition to the base work described above, the solicitation will include the following option line items: 1. MAC Pad - Construct 1,167 SY concrete pad for the Material Assembly Center (MAC), required for constructing munitions, along with new asphalt pavement for access and egress to the facility's maintenance bays. - KNMD209086 Conventional Munitions Cube Storage Addition - Construct an addition to the Munitions Cube Storage Facility (B3552) utilizing conventional design and construction methods to support the F-22 mission. This project has a statutory cost limitation $14M for Unspecified Minor Military Construction (UMMC) Project Adjustment of Dollar Limitations for Location pursuant to 10 USC §2805. Project square footage is estimated at 1,320 SF. Work covered in this project includes but is not limited to: Substructure & Enclosure: Micro-pile foundations, concrete wall structures, cast-in-place concrete slabs, and 12" thick concrete walls designed for high-hazard storage specifications. Framing & Roofing: Structural steel framing, roof joists, and standing seam metal roofing matching existing facility standards. Exterior Elements: Erection of new asphalt pavement adjacent to the existing facility access to provide adequate logistics and material handling access around the new facility addition. Specialized Protection: Maintenance facility lightning and grounding protection systems, along with integrated fire detection and alarm reporting systems connected back to the base reporting system. APPLICABLE TO BOTH PROJECTS RAB Lighting exterior wall packs and area lights are sole source/brand name specific for compatibility with existing installation systems (noted justifications will be included with solicitation). Project Phasing & Security Gates: The contractor will be required to erect a temporary security fence around the construction zone in accordance with the project staging and phasing drawings. Escort…
Lingua di questo bando: English. Titolo e descrizione sono mostrati esattamente come pubblicati dalla stazione appaltante.
Source: SAM · reference W50SLF-26-R-A005 · JSON