Out For Tender › États-Unis › Services de réparation et d'entretien
Cleaning and Impregnation of CLET Heat Exchangers
- Acheteur
- W6QK LAD CONTR OFF, Dept of Defense
- Pays
- États-Unis
- Catégorie
- Services de réparation et d'entretien
- Date limite
- Clôture dans 13 jours (9 Oct 2026 16:00 UTC-4)
- Publié le
- 17 Sep 2026
- Procédure
- Combined Synopsis/Solicitation - Small Business Set Aside - Total
Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.
Ce que l'acheteur demande
Combined Synopsis/Solicitation W911N226QA066 General Information This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with RFO FAR Part 12. This announcement constitutes the only solicitation Offers are being requested and a separate written solicitation will not be issued. Solicitation number W911N226QA066 is issued as a Request for Quotation (RFQ) for the cleaning, impregnation and testing of manifolds required for CLET (Cooler, Liquid, Electron Tube) heat exchangers. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The Product Service Code (PSC) assigned to this acquisition is J010 Maint/Repair/Rebuild of Equipment - Weapons. The North American Industry Classification System (NAICS) code for this acquisition is 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring. This procurement will utilize the solicitation procedures at RFO FAR 12.201-1(c)(1). This announcement combines the presolicitation notice and the RFQ according to 12.202(b). The anticipated award date of this requirement is 27 October 2026. CLIN Description QTY Unit Price Total Price 0001 First Article Sample Hydraulic Manifold (PN: 11449142) Firm Fixed Price (FFP) The Contractor shall produce a first article of each item listed in Paragraph 3.1 for first article testing/acceptance by the Government in accordance with Performance Work Statement (PWS) paragraph 5.6. Estimated PoP: 28 October 2026 to 27 October 2031 Unit of Measure: LOT, QTY 1 LOT 0002 First Article Sample Hydraulic System Accessories Manifold (PN: 11449200) Firm Fixed Price (FFP) The Contractor shall produce a first article of each item listed in Paragraph 3.1 for first article testing/acceptance by the Government in accordance with Performance Work Statement (PWS) paragraph 5.6. Estimated PoP: 28 October 2026 to 27 October 2031 Unit of Measure: LOT, QTY 1 LOT 0003 First Article Sample Hydraulic Manifold (PN: 11465687) Firm Fixed Price (FFP) The Contractor shall produce a first article of each item listed in Paragraph 3.1 for first article testing/acceptance by the Government in accordance with Performance Work Statement (PWS) paragraph 5.6. Estimated PoP: 28 October 2026 to 27 October 2031 Unit of Measure: LOT, QTY 1 LOT 0004 First Article Sample Manifold Assembly (P/N: 11463809) Firm Fixed Price (FFP) The Contractor shall produce a first article of each item listed in Paragraph 3.1 for first article testing/acceptance by the Government in accordance with Performance Work Statement (PWS) paragraph 5.6. Estimated PoP: 28 October 2026 to 27 October 2031 Unit of Measure: LOT, QTY 1 LOT 0005 First Article Sample Hydraulic System Accessories Manifold (PN: 11463577) Firm Fixed Price (FFP) The Contractor shall produce a first article of each item listed in Paragraph 3.1 for first article testing/acceptance by the Government in accordance with Performance Work Statement (PWS) paragraph 5.6. Estimated PoP: 28 October 2026 to 27 October 2031 Unit of Measure: LOT, QTY 1 LOT 0006 First Article Sample Heater Tube Manifold (PN: M7499) Firm Fixed Price (FFP) The Contractor shall produce a first article of each item listed in Paragraph 3.1 for first article testing/acceptance by the Government in accordance with Performance Work Statement (PWS) paragraph 5.6. Estimated PoP: 28 October 2026 to 27 October 2031 Unit of Measure: LOT, QTY 1 LOT 0007 First Article Sample Heater Tube Manifold (PN: M7498) Firm Fixed Price (FFP) The Contractor shall produce a first article of each item listed in Paragraph 3.1 for first article testing/acceptance by the Government in accordance with Performance Work Statement (PWS) paragraph 5.6. Estimated PoP: 28 October 2026 to 27 October 2031 Unit of Measure: LOT, QTY 1 LOT 0008 Cleaning and Impregnation of Hydraulic Manifold (PN: 11449142)…
Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.
Source: SAM · reference W911N226QA066 · JSON