Out For Tender

Out For Tender › États-Unis › Travaux de construction

Gas Leak Repair, Valve Installation, and Asphalt Patching Services

This tender has closed. It stays online as a record of what was advertised.

Acheteur
SPECIAL MISSION TRAINING CENTER (SMTC), Homeland Security, Department of
Pays
États-Unis
Catégorie
Travaux de construction
Date limite
Clôturé (4 Nov 2026 11:00 UTC-5)
Publié le
29 Oct 2026
Procédure
Solicitation - Small Business Set Aside - Total

Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.

Ce que l'acheteur demande

Description This is a solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number 75110PR270000104 is issued as a request for quotation (RFQ) for gas-leak detection and repair, gas-valve installation, gravel backfill, asphalt patching, and site cleanup at Birmingham Southern College in Birmingham, Alabama. This acquisition is set aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01 Effective Date 03/13/2026. The associated North American Industrial Classification System (NAICS) code for this procurement is 237120, with a small business size standard of $45.0M. Product Service Code is Z2NA. Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. As a minimum, offers shall include— (1) The solicitation number. (2) The name, address, telephone number of the Offeror. (3) The Offeror’s Unique Entity Identifier (UEI) (4) Information necessary to evaluate the factors contained in the provision at 52.212-2 (5) Responses to provisions that require Offeror completion of information, representations, and certifications (other than those collected via the System for Award Management (SAM)); and (6) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and any solicitation amendments. Period for acceptance of offers. The Offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation. The Coast Guard Training Center Birmingham Southern is seeking to purchase gas-leak repair services, including excavation, gas-line repair, gas-valve installation, testing, gravel backfill, asphalt patching, and site cleanup. All interested companies must provide quotation(s) for the following services: CLIN 0001 — Excavation, Spoil Removal, and Gravel Backfill: The Contractor shall saw-cut and excavate a 6-foot by 6-foot area, as needed, to locate and fully expose the gas leak. The Contractor shall remove and properly dispose of all excavated material and shall provide and place clean gravel backfill after the gas-line repair and required testing are complete. Government-provided line locating is not included in this CLIN. This CLIN is associated with SOW Task 2.1. CLIN 0002 — Gas-Line Repair, Valve Installation, and Testing: The Contractor shall provide all labor, materials, equipment, pipe, fittings, valve, and testing needed to repair the identified gas leak and install a new gas valve. This CLIN includes all work needed to stop the leak and restore the gas line to working condition within the 6-foot by 6-foot excavation area. The Contractor shall test the repaired gas line and valve before backfill. This CLIN is associated with SOW Sections 1.2 and 1.3 and SOW Task 2.2. CLIN 0003 — Asphalt Patching: The Contractor shall patch the 6-foot by 6-foot excavated area after completing the gas-line repair, testing, and gravel backfill. The asphalt patch shall match the existing pavement in material and thickness, be properly compacted, and be level with the surrounding parking lot surface. This CLIN is associated with SOW Task 2.3. CLIN 0004 — Site Cleanup and Removal of Equipment: The Contractor shall remove all debris, excess materials, equipment, and temporary items from the work area. The Contractor shall leave the site clean, orderly, and ready for Government inspection. This CLIN is associated with SOW…

Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.

How this compares

  • This is one of 877 open tenders in États-Unis for Travaux de construction.
  • Bidders were given 6 days from publication to the deadline; the median for open tenders in États-Unis is 22 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference 75110PR270000104 · JSON